Gloucester

Named in 6 PJM planning documents for 3 projects, from October 16, 2025 to October 6, 2026.

Not stateddescribed as
PSEGzone
69 kV, 69kVkV as printed
6mentions

PJM interconnection queue

A PJM queue substation page has the same name: Gloucester (NJ) — 8 queue requests filed, 3 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Gloucester - Nicholson 69kV Line
b4020.1
Not printed $10.8M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Gloucester - Nicholson 69kV Line Not printed $10.8M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
PSE&G Southern Territory
PSEG-2025-0007 · s3809
Engineering $42.8M 12/31/2028 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status conceptual (Conceptual) → engineering (Engineering and Planning) 2025-12-11 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2026.xlsx p. 8
PSE&G Southern Territory No role wording
69kV
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2026 RTEP p. 8
PSE&G Southern Territory No role wording
69kV
2025-12-11 SRRTEP Mid-Atlantic
Item 12 - PSEG Supplemental Projects p. 9
PSE&G Southern Territory No role wording
69kV
2025-11-13 SRRTEP Mid-Atlantic
Item 06 - PSEG Supplemental Projects - Version 2 p. 4
PSE&G Southern Territory No role wording
69kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 9
Gloucester - Nicholson 69kV Line No role wording
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 9
Gloucester - Nicholson 69kV Line No role wording
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.