Substation Scout

Fork Union

Named in 5 PJM planning documents for 5 projects, from November 4, 2025 to September 8, 2026.

Existingdescribed as
DOMzone
230 kV, 230kVkV as printed
5mentions

PJM interconnection queue

A PJM queue substation page has the same name: Fork Union (VA) — 2 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV
b4030.9
Not printed $127.05 M 6/1/2030 Not printed 2025-12-08
TEAC
DOM Transmission Zone: Baseline Bremo to Fork Union 115kV
b4031.1
Not printed $7M 6/1/2030 Not printed 2025-12-11
SRRTEP Southern
Bremo to Fork Union 115kV Not printed $7M 6/1/2030 Not printed 2025-11-13
SRRTEP Southern
Line #298 EOL Rebuild – Farmville to Fork Union
DOM-2026-0019
Conceptual $96M 07/30/2030 Not printed 2026-09-08
TEAC
Hopewell – Chesterfield – Basin 230 kV
2025-W1-911
Not printed $113.55 M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BREMO; FARMVILLE → BREMO; FARMVILLE; FORK UNION 2026-05-08 2026-09-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08 TEAC
Item 10 - DOM Supplemental Projects p. 9
Line #298 EOL Rebuild – Farmville to Fork Union “The new 230 kV line will terminate at the Fork Union Substation”
230 kV
2025-12-11 SRRTEP Southern
Item 03 - SRRTEP South - Reliability Analysis Update p. 4
DOM Transmission Zone: Baseline Bremo to Fork Union 115kV “Upgrade all relevant substation equipment at Fork Union substations”
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 24
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV “Uprate all Line #2028 terminal equipment, line leads, and bus at Fork Union substation”
230kV
2025-11-13 SRRTEP Southern
Item 02 - SRRTEP South - Reliability Analysis Update p. 4
Bremo to Fork Union 115kV “Upgrade all relevant substation equipment at Bremo and Fork Union substations”
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 33
Hopewell – Chesterfield – Basin 230 kV “Uprate all Line #2028 terminal equipment, line leads, and bus at Charlottesville and Fork Union substations”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this