Substation Scout

Mt. Airy

Named in 6 PJM planning documents for 2 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
APSzone
230 kVkV as printed
6mentions

Also printed as: Mt. Airy Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Carroll 230/138 kV Transformer #4 and Misoperation Relays
APS-2023-034 and APS-2023-063 · s3189.1, s3190.1
Not printed $8.6M 12/31/2026 Not printed 2024-10-08
TEAC
Carroll - Mount Airy 230 kV line
APS-2023-058 · s3871.1
Not printed $50M 06/30/2029 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named CARROLL; MT AIRY → CARROLL; MOUNT AIRY; MT AIRY 2025-11-04 2026-04-07
Substations named CARROLL; MOUNT AIRY; MT AIRY → CARROLL; MT AIRY 2026-04-07 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 41
Carroll - Mount Airy 230 kV line “Adjust relaying at Carroll and Mt. Airy substations”
230 kV
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 41
Carroll - Mount Airy 230 kV line “Adjust relaying at Carroll and Mt. Airy substations”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 66
Carroll 230/138 kV Transformer #4 and Misoperation Relays “At Mt. Airy Substation : Replace line tuner and coax, wave trap, circuit breaker, disconnect switch, and relaying”
230 kV
2026-04-07 TEAC
Item 03 - APS Supplemental Projects p. 3
Carroll - Mount Airy 230 kV line “Adjust relaying at Carroll and Mt. Airy substations”
2025-11-04 TEAC
Item 04 - APS Supplemental Projects - Version 7 p. 10
Carroll - Mount Airy 230 kV line “Adjust relaying at Carroll and Mt. Airy substations”
230 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 66
Carroll 230/138 kV Transformer #4 and Misoperation Relays “At Mt. Airy Substation :”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.