Named in 4 PJM planning documents for 1 project, from April 15, 2026 to October 6, 2026.

Existingdescribed as
DEOKzone
138 kV, 138kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Mt. Healthy Substation Rebuild
DEOK-2026-002 · s3910.1 - .3
Engineering $8.6M 05/07/2029 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status conceptual (Scoping) → engineering (Engineering) 2026-05-15 2026-10-06
Substations named FINNEYTOWN; MAPLEKNOLL; MT HEALTHY; TERMINAL; WILLEY → FINNEYTOWN; MAPLEKNOLL; MT HEALTHY; WILLEY 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - DEOK Local Plan Submission of the supplemental projects for 2026 p. 9
Mt. Healthy Substation Rebuild “Finneytown Substation: Install two 138 kV CCVT’s”
138 kV
2026-09-30* SRRTEP Western
DEOK local plan submission of the supplemental projects for 2026 RTEP p. 8
Mt. Healthy Substation Rebuild “Install two 138 kV CCVT’s, two relays, and necessary conduits to create ATO scheme”
138 kV
2026-05-15 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 4
Mt. Healthy Substation Rebuild “Finneytown Substation: Install two 138 kV CCVT’s, two relays, and necessary conduits”
138 kV
2026-04-15 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 3
Mt. Healthy Substation Rebuild No role wording
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.