Substation Scout

Englishtown

Named in 14 PJM planning documents for 10 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
JCPLzone
115 kV, 115-34.5 kV, 230-34.5 kV, 34.5 kV, 34.5 kVkV as printed
20mentions

Also printed as: Englishtown Substation

PJM interconnection queue

A PJM queue substation page has the same name: Englishtown (NJ) — 2 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Jamesburg – Monroe 34.5 kV Line
b4016.1
Not printed $6.35 M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Jamesburg – Monroe 34.5 kV Line Not printed $6.35 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Automatic Restoration Projects
JCPL-2023-024 · s3244.1
Not printed $2.56 10/15/2025 Not printed 2024-10-08
TEAC
Deep Run – Englishtown 115 kV DRE2 Line
JCPL-2023-056 · s3966.1
Not printed $36.34M 05/18/2029 Not printed 2026-10-06
TEAC
Deep Run – Englishtown 115 kV DRE1 Line
JCPL-2023-066 · s3967.1
Not printed $38.88M 05/19/2028 Not printed 2026-10-06
TEAC
JCPL Transmission Zone M-3 Process Deep Run No. 2 115-34.5 kV Transformer
JCPL-2024-026 · s3614.1
Not printed $8M 12/31/2027 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Englishtown No. 1 115-34.5 kV Transformer
JCPL-2024-028 · s3618.1
Not printed $7M 12/31/2027 Not printed 2025-10-08
TEAC
Englishtown No. 6 230-34.5 kV Transformer
JCPL-2025-005 · s3962.1
Not printed $2.06 M 12/17/2026 Not printed 2026-10-06
TEAC
Jerseyville - Smithburg 34.5 kV X752 Line
JCPL-2026-024
Not printed Not printed Not printed Not printed 2026-09-17
SRRTEP Mid-Atlantic
Wyckoff Street Substation
JCPL-2026-050
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DEEP RUN → DEEP RUN; ENGLISHTOWN; RARITAN RIVER 2025-10-08 Not reported
Substations named ENGLISHTOWN → DEEP RUN; ENGLISHTOWN; WYCKOFF ST 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects Presentation p. 6
Wyckoff Street Substation No role wording
34.5 kV
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 22
Englishtown No. 6 230-34.5 kV Transformer “Replace limiting substation equipment of transformer leads to exceed the Englishtown No. 6 Transformer ratings”
230-34.5 kV
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 32
Deep Run – Englishtown 115 kV DRE2 Line “At Englishtown Substation, replace relays and substation conductor”
115 kV
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 34
Deep Run – Englishtown 115 kV DRE1 Line “At Englishtown Substation, replace relays and substation conductor”
115 kV
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 22
Englishtown No. 6 230-34.5 kV Transformer “Replace limiting substation equipment of transformer leads”
230-34.5 kV
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 32
Deep Run – Englishtown 115 kV DRE2 Line “At Englishtown Substation, replace relays and substation conductor.”
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 34
Deep Run – Englishtown 115 kV DRE1 Line “At Englishtown Substation, replace relays and substation conductor.”
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 7
Jerseyville - Smithburg 34.5 kV X752 Line No role wording
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 19
JCPL Transmission Zone M-3 Process Deep Run No. 2 115-34.5 kV Transformer No role wording
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 23
Englishtown No. 1 115-34.5 kV Transformer “Replace the No. 1 115-34.5 kV Transformer at Englishtown Substation”
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 14
Automatic Restoration Projects “At Englishtown, replace relaying”
34.5 kV
2026-05-14 SRRTEP Mid-Atlantic
Item 05 - JCPL Supplemental Projects p. 14
Deep Run – Englishtown 115 kV DRE2 Line “At Englishtown Substation, replace relays and substation conductor”
115 kV
2026-05-14 SRRTEP Mid-Atlantic
Item 05 - JCPL Supplemental Projects p. 16
Deep Run – Englishtown 115 kV DRE1 Line “At Englishtown Substation, replace relays and substation conductor”
115 kV
2025-12-08 TEAC
Item 06 - JCPL Supplemental Projects p. 8
Englishtown No. 6 230-34.5 kV Transformer “Replace limiting substation equipment of transformer leads to exceed the Englishtown No. 6 Transformer ratings.”
230-34.5 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 28
Jamesburg – Monroe 34.5 kV Line No role wording
2025-11-04 TEAC
Item 05 - JCPL Supplemental Projects p. 3
Englishtown No. 6 230-34.5 kV Transformer No role wording
230-34.5 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 28
Jamesburg – Monroe 34.5 kV Line No role wording
34.5 kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 23
Englishtown No. 1 115-34.5 kV Transformer “Replace the No. 1 115-34.5 kV Transformer at Englishtown Substation”
115-34.5 kV
2024-11-14 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects p. 11
Englishtown No. 1 115-34.5 kV Transformer “Replace the No. 1 115-34.5 kV Transformer at Englishtown Substation”
115-34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 14
Automatic Restoration Projects “At Englishtown, replace relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this