Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 3 |
Bedington – Eagle 138 kV | Bedington Eagle |
Cost $1.96M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 5 |
Meadow Brook-West Winchester 138 kV | Meadow Brook West Winchester |
Cost $0.35M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 7 |
Lakeview-Ottawa 138 kV Line | Lakeview Ottawa |
Cost $1.41M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 9 |
Abbe-Johnson No.1 69 kV Line | Abbe Elyria Water P.C. Johnson Lorain College Spring Valley |
Cost $3.22M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 11 |
Bellevue-Groton 69 kV Line | Bellevue Groton |
Cost $10.1M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 13 |
McGuffey-Locust 69 kV Line Rebuild | Locust McGuffey |
Cost $5.316 M In service 05/29/2029 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 15 |
State Line 345/138 kV Transformer | State Line | Cost $20.81 M In service 12/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 17 |
Cherry Valley 345/138 kV Transformer | Cherry Valley | Cost $7.74 M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 19 |
Elk Grove 345/138 kV Transformer | Elk Grove | Cost $28.96 M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 21 |
Adjust Mullens 138 kV Cap Bank | Guyandotte Marianna Coal Mullens |
Cost $0.1M In service 12/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 23 |
Jarrett 138/46 kV Transformer & Hartland 46 kV Cap Adjustment | Hartland Jarrett Kelly Creek Mammoth |
Cost $0.2M In service 4/15/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 25 |
Reduce Baileysville 46 kV Cap Bank | Baileysville Marsh Fork |
Cost $0.1M In service 12/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 27 |
Replace Johns Creek 69kV Capacitor Bank | Hatfield Johns Creek |
Cost $1.477 M In service 4/15/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 29 |
Huff Creek and Chauncey 138 kV Transformer Tap Settings | Chauncey Huff Creek WVA Coal |
Cost $0.2 M In service 4/15/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 31 |
Tazewell 138 kV Transformer Setting Adjustment | McDowell Tazewell |
Cost $0.1 M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 33 |
Falcon 69 kV Capacitor Bank Installation | Falcon Middle Creek |
Cost $3.35 M In service 04/15/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 35 |
Joshua Falls 138 kV Circuit Breaker Replacements | Joshua Falls | Cost $1.514M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 37 |
Roberts-Wilson 138kV line “in & out” of Milepost 138kV | Blair Bolton Fisher Hall Milepost Roberts Trabue Wilson |
Cost $12.17 M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 39 |
Upgrade Station Conductor at Galloway 69kV | Cole Galloway |
Cost $0.18 M In service 06/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 41 |
Haviland 138 kV Transformer #4 Replacement | Haviland | Cost $5.87M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 43 |
Elliot - Ohio University 69kV Sag Mitigation | Elliot Ohio University |
Cost $0.36M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 45 |
Lick - Ironman 69kV Reconductor | Ironman Lick |
Cost $1.099M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 47 |
South Side Lima Station 34.5 kV Upgrades | Lima Pump SS South Side Lima |
Cost $0.08M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 49 |
North Newark Transformer #1 138/69 kV Replacement | North Newark | Cost $6.33 M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 51 |
Findlay Center 138 kV Transformer Replacement | Findlay Center | Cost $3.936 M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 53 |
Kenton - South Kenton 69kV line rebuild | Kenton Kenton2 South Kenton |
Cost 13.19M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 55 |
138 kV Haviland Station Bus Upgrades | Haviland Timber SW |
Cost 1.468 M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 57 |
East Lima - Haviland 138kV Sag Study | East Lima Haviland |
Cost 6.80M In service 04/15/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 59 |
Catawba Add a 138/69 kV Transformer | Catawba | Cost 7.77M In service 06/01/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 62 |
Bethel Road 138 kV Breakers “A, D, E, F, AA, XT1, XT2” Replacement | Bethel Road | Cost $3.564M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 64 |
Hess Street 138 kV Breakers “4, XT1, XT2, XT3, XT4” Replacement | Hess Street | Cost $4.603M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 66 |
New Carlisle 138 kV Breaker “XT3” Replacement | New Carlisle | Cost $1.025M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 68 |
New Proctorville 138 kV Breaker “XT3” Replacement | New Proctorville | Cost $0.94M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 70 |
OSU 138 kV Breakers “102, 103, XT4” Replacement | OSU | Cost $2.9M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 72 |
Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement | Roberts | Cost $0.85M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 74 |
Tidd 138 kV Breaker “DD” Replacement | Tidd | Cost $0.773M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 76 |
Ringgold 138 kV Breaker “138 BUS TIE” Replacement | Ringgold | Cost $0.957M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 78 |
Belmont 138 kV Breaker “B-8” Replacement | Belmont | Cost $0.957M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 80 |
Avon 138 kV Breakers “4-B-107 and 4-B-84” Replacement | Avon | Cost $1.92M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 82 |
Eastlake 138 kV Breaker Replacements – 12 breakers | Eastlake | Cost $11.48M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 84 |
Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement | Hoytdale | Cost $2.87M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 86 |
Johnson 69 kV Breaker “451-B-163” Replacement | Johnson | Cost $0.957M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 88 |
Cambridge 34.5 kV F CB Replacement | Cambridge | Cost $0.8M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 90 |
Thomas Road 69 kV XT1 CB Replacement | Thomas Road | Cost $0.72M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 92 |
Hazard 69 kV R CB Replacement | Hazard | Cost $0.85M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 94 |
Greenfield 69 kV B-24, B-272, B-274 CB Replacement | Greenfield | Cost $1.53M In service 6/1/2030 |
| 2025-10-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 3 |
Misoperation Relays: Armstrong - Kittanning 138 kV Line APS-2024-010 |
Armstrong Substation Kittanning Substation |
Status Conceptual Cost $3.44M In service 09/10/2029 |
| 2025-10-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 6 |
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line APS-2024-102 |
Belmon Charleroi Mitchell Smithton Substation Yukon |
Status Conceptual Cost $3.71M In service 10/31/2028 |
| 2025-10-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 10 |
Misoperation Relays: Cecil – Enlow 138 kV Line APS-2024-105 |
Cecil Enlow |
Status Conceptual Cost $4.0M In service 06/11/2029 |
| 2025-10-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 13 |
Kiski Valley - North Washington 138 kV Line APS-2025-027 |
Kiski Valley North Washington |
Status Conceptual Cost $2.79M In service 03/27/2030 Load 9.9 MW |
| 2025-10-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 15 |
Price Hill Substation APS-2025-028 |
Price Hill Substation South Morgantown |
Status Conceptual Cost $0.10M In service 04/03/2026 |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 3 |
BP Husky – Jackman 138 kV Line ATSI-2025-024 |
Fort Industry Substation | No figures printed |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 4 |
Bellevue – West Fremont 69 kV Line ATSI-2025-026 |
None named | No figures printed |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 5 |
Ironville-Sun Oil 69 kV Line ATSI-2025-027 |
None named | No figures printed |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 6 |
Ravenna – Streetsboro 69 kV Line ATSI-2025-028 |
West Ravenna | No figures printed |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 7 |
Ironville-Locust 69 kV Line ATSI-2025-029 |
None named | No figures printed |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 8 |
Clark - North Hampton 69 kV Line ATSI-2025-030 |
North Hampton Substation | In service 6/1/2028 |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 9 |
London - Tangy 138 kV Line ATSI-2025-031 |
None named | In service 8/16/2027 |
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 11 |
Carlisle - Johnson 138 kV Line ATSI-2025-025 |
Carlisle Johnson |
Status Conceptual Cost $2.08M In service 10/27/2027 |
| 2025-10-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 3 |
Pickaway County, OH AEP-2025-OH010 |
Good Hope SW Lemaster Lockbourne |
Load 135 MW |
| 2025-10-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 4 |
East Tiffin, OH/Mousey Switch, OH AEP-2025-OH024 |
North Central Co-op West Rockaway |
No figures printed |
| 2025-10-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 5 |
Abert, VA AEP-2025-AP007 |
Abert | No figures printed |
| 2025-10-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 7 |
East Leipsic, OH AEP-2025-OH011 |
East Leipsic | Status Engineering Cost $10.624 M In service 11/01/2027 |
| 2025-10-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 9 |
Hicksville, OH AEP-2022-OH028 |
Lockwood Road Sowers |
Status Engineering Cost $36.008 M In service 04/26/2029 |
| 2025-10-17 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 3 |
Cherry Valley 138 kV 1-2 CB ComEd-2025-023 |
Cherry Valley | No figures printed |
| 2025-10-17 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 5 |
Sandwich Substation ComEd-2025-019 |
Sandwich | Status Conceptual Cost $33.8 M In service 12/31/2028 |
| 2025-10-17 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 7 |
Customer in Chicago ComEd-2025-020 |
State Line | Status Engineering Cost $2.6 M In service 8/28/2026 Load 179.4 MW |
| 2025-10-17 | SRRTEP Western Item 06 - EKPC Supplemental Projects p. 3 |
Skaggs, KY EKPC-2025-005 |
AEP Thelma Rowan County Skaggs Thelma |
No figures printed |
| 2025-10-17 | SRRTEP Western Item 06 - EKPC Supplemental Projects p. 4 |
Murphysville, KY EKPC-2025-006 |
Murphysville | No figures printed |
| 2025-10-17 | SRRTEP Western Item 06 - EKPC Supplemental Projects p. 5 |
Owen County, KY EKPC-2025-007 |
Boone County Clay Village Owen Owen County Penn West Frankfort |
No figures printed |
| 2025-10-17 | SRRTEP Western Item 06 - EKPC Supplemental Projects p. 7 |
Shelby County, KY EKPC-2025-004 |
Bekaert Budd Joyes Station New Joyes Station #1 New Joyes Station #2 New KU West Shelby Logan T Shelby Co |
Status Engineering Cost $9.84 M In service 05/01/2030 Load 48 MW |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3 |
Vienna – Loretto 138kV Line | Loretto Vienna |
Cost 1.814 M In service 5/31/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 4 |
Sharptown – Laurel 69kV Line | Laurel Sharptown |
Cost $38.249 M In service 5/31/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 5 |
ODEC Thermal And Voltage Solutions | Belle Haven Cheriton Hallwood Kellam Oak Hall Parksley Parsley Perdue Tasley |
Cost $132.01M In service 12/31/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 7 |
Rahway - Roselle 69kV Line | Blair Road Rahway Roselle |
Cost $29.4 M In service 12/31/2029 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 9 |
Gloucester - Nicholson 69kV Line | Gloucester Hilltop Lawnside Nicholson |
Cost $10.8M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 12 |
Prospect Park - North Paterson 69 kV Line | Cedar Grove Harvey North Paterson Prospect Park |
Cost $15.703M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 14 |
Greene Street – Constitution St 115 kV Line | Constitution St Greene St |
Cost $58.49M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16 |
Jackson – North Hanover 115 kV Line | Eisenhower Fairview Gitts Run Jackson North Hanover |
Cost $61.79 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 19 |
Belleville – Center Union 46 kV Line | Belleville Center Union |
Cost $2.72 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 21 |
Colts Neck 34.5 kV Substation | Colts Neck | Cost $2.69 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 23 |
Sussex 34.5 kV Substation | Sussex | Cost $2.28 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 25 |
Long Branch 34.5 kV Substation | Bath Ave Long Branch Substation |
Cost $532 K In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 27 |
Jamesburg – Monroe 34.5 kV Line | Costco Englishtown Jamesburg Monroe Monroe Junction |
Cost $6.35 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 29 |
Great Adventure 34.5 kV Substation | Cookstown Great Adventure Great Adventure Tap Greater Adventure Van Hiseville Windsor |
Cost $61.68 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32 |
Metedconk and Vermont Ave 34.5 kV Substations | Larrabee Leisure Village Metedconk South Lakewood Vermont Ave Vermont Avenue New |
Cost $65.74 M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 36 |
E.Flemington 34.5kV CB Replacements H736, YH, Y727, AV, TC, C731, V724, A729 | E.Flemington | Cost $3.5M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 38 |
Windsor 34.5kV CB Replacements: KQ, Q143, B-25, B-22, B-31, B-34, B-19, B-28, B-16, BK4, B-7, B-8, B-54, B-51 | Windsor | Cost $8.4M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 40 |
Warren 115kV Breaker “NO.1 XFMR” Replacement | Warren | Cost $0.957M In service 6/1/2030 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 43 |
Bergen 138 kV series reactors b3869.3 |
Bergen East Rutherford Fairlawn |
Cost $12.77M In service 9/1/2027 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 03 - ACE Supplemental Projects p. 3 |
ACE-2025-001 | None named | Load 40 MW |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 04 - DPL Supplemental Projects p. 3 |
DPL-2025-002 | Keeney Keeney EHV |
Status Construction (Under construction) Cost $0.15 million In service 12/24/2025 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 3 |
Hill Valley - Huntingdon - Raystown 46 kV RAC Line PN-2025-004 |
Hill Valley Huntingdon Raystown |
No figures printed |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 06 - PPL Supplemental Projects p. 3 |
West Damascus, PA PPL-2025-0025 |
West Damascus | No figures printed |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 06 - PPL Supplemental Projects p. 5 |
Kenmar, PA PPL-2019-0006 |
Clinton Lycoming Muncy |
Status Conceptual Cost $30 M In service 12/31/2028 |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 07 - PSEG Supplemental Projects p. 3 |
Secaucus Area Data Centers PSEG-2025-0003 |
None named | In service 07/2028 Load 120 MW |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 07 - PSEG Supplemental Projects p. 4 |
Secaucus Area Data Centers PSEG-2025-0004 |
None named | In service 06/2028 Load 70 MW |
| 2025-10-16 | SRRTEP Southern Item 08 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2025-0058 |
Bains Store Bayside Burton Long Creek VA Beach |
No figures printed |
| 2025-10-16 | SRRTEP Southern Item 08 - DOM Supplemental Projects p. 4 |
Customer Load Request DOM-2025-0075 |
Gosport Ind. Substation | In service 07/31/2029 Load 144.5 MW |
| 2025-10-16 | SRRTEP Southern Item 08 - DOM Supplemental Projects p. 5 |
Customer Load Request DOM-2025-0080 |
Cradock Substation | In service 04/30/2027 Load 18 MW |
| 2025-10-16 | SRRTEP Southern Item 08 - DOM Supplemental Projects p. 6 |
Operational Flexibility and Efficiency DOM-2025-0081 |
Kerr Dam | No figures printed |
| 2025-10-16 | SRRTEP Southern Item 08 - DOM Supplemental Projects p. 8 |
Bass 115kV Delivery - MEC DOM-2025-0034 |
Bass New Bass DP New Ivory Lane Sub Skippers |
Status Construction (Under construction) Cost $4M In service Q1 2026 Load 6.5 MW |
| 2025-10-08 | TEAC Informational Only - ACE Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Pine Hill Substation ACE-2024-003 · s3664.1 |
Pine Hill Sickler Stratford |
Status Conceptual Cost $35.53 M In service 9/1/2029 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
AEP Transmission Zone M-3 Process
Ligonier, Indiana AEP-2024-IM010 · s3591.1-.2 |
Charger Station Ligonier |
Status Scoping (Conceptual) Cost $2 M In service 09/14/2027 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
AEP Transmission Zone M-3 Process
Columbus, OH AEP-2023-OH004 · s3577.1-.3 |
Bexley Etna Road Poth station |
Status Scoping (Conceptual) Cost $7.233 M In service 09/30/2026 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 7 |
AEP Transmission Zone M-3 Process
Scioto County, Ohio AEP-2022-OH068 · s3589.1 |
North Portsmouth Oertels Corner |
Status Scoping (Conceptual) Cost $3.873 M In service 05/01/2026 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 9 |
AEP Transmission Zone M-3 Process
New Albany, OH AEP-2023-OH070 · s3590.1-.3 |
Green Chapel New Groves Corner station New Kiber station New |
Status Engineering Cost $32.288 M In service 01/02/2026 Load 43 MW |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 11 |
AEP Transmission Zone M-3 Process
Project Amazing Sites 100 and 201 AEP-2023-IM023 · s3588.1-.7 |
Dumont Elderberry station Kenzie Creek Larrison Drive New New Prairie New Olive Sorenson Thomson |
Status Scoping (Conceptual) Cost $184.977M In service 12/15/2026 Load 1100MW |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 13 |
AEP Transmission Zone M-3 Process
Franklin, OH AEP-2024-OH033 · s3593.1-.3 |
Bexley Drew station New St. Clair Ave |
Status Scoping (Conceptual) Cost $10.793 M In service 11/30/2026 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 15 |
AEP Transmission Zone M-3 Process
Western Indiana and Central Ohio AEP-2023-IM015 · s3594.1 |
Olive Reynolds |
Cost $452.64 M In service 05/30/2031 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 20 |
AEP Transmission Zone M-3 Process
Summerhill, OH AEP-2024-OH015 · s3596.1 |
Summerhill | Status Scoping (Conceptual) Cost $2.03 M In service 02/01/2027 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 22 |
AEP Transmission Zone M-3 Process
Fort Wayne, IN AEP-2023-IM018 · s3595.1 |
Bass Industrial Park Slater Steel Spring St Spy Run |
Status Scoping (Conceptual) Cost $6.758 M In service 3/17/2028 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 24 |
AEP Transmission Zone M-3 Process
Kanawha County, WV AEP-2022-AP031, AEP-2023-AP022 · s3606.1-2 |
Turner Station Ward Hollow 46 kV Station |
Status Scoping (Conceptual) Cost $33.1 M In service 08/01/2027 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
AEP Transmission Zone M-3 Process
Greenbrier County, WV AEP-2023-AP017 · s3607.1-3 |
Glen Lyn Station Grandview Station Hinton Station |
Cost $7.8 M In service 11/05/2029 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 30 |
AEP Transmission Zone M-3 Process
Wood County, Ohio AEP-2019-OH052, AEP-2022-OH027 · s3641.1-15 |
Bellard station Greensburg New Gypsy Lane station New Liberty North Baltimore Poe Road substation Portage Sandridge 69kV substation |
Status Scoping (Conceptual) Cost $80.204 M In service 11/30/2028 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 37 |
AEP Transmission Zone M-3 Process
Jefferson County, Ohio AEP-2022-OH017 · s3724.1-2 |
Ft Steuben Hammondsville |
Status Scoping (Conceptual) Cost $84.162 M In service 03/16/2029 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 39 |
AEP Transmission Zone: Supplemental
S2167 Scope Change AEP-2018-IM002, AEP-2019-IM035, AEP-2019-IM025, AEP-2019-IM046 · S2167 |
Boundary station New FourFlag station New Kenzie Creek Lake Street station Niles station Pokagon station South Side Station Swanson station |
Status Scoping (Conceptual) Cost $125.8M In service 3/13/2026 |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 41 |
AEP Transmission Zone M-3 Process
Fall Creek, IN AEP-2024-IM013 · 3723.1-3 |
Aladdin station Desoto Fall Creek |
Status Scoping (Conceptual) Cost $9.326 M In service 05/27/2026 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Misoperation Relay Projects APS-2024-057 · s3540.1 |
Doubs Frostown Junction Ringgold |
Cost $6.30 In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Misoperation Relay Projects APS-2024-058 · s3541.1 |
Lime Kiln Montgomery |
Cost $9.20 In service 10/31/2026 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 5 |
Misoperation Relay Projects APS-2020-003, PN-2020-004 · s3542.1 |
Burma Piney |
Cost $1.9 In service 10/31/2025 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Monocacy No. 4 230/138 kV Transformer APS-2024-061 · s3573.1 |
Monocacy Substation | Cost $9.00 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
Pruntytown No. 3 500/138 kV Transformer APS-2024-071 · s3574.1 |
Pruntytown Substation | Cost $15.77 M In service 6/30/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Stony Springs Junction Area APS-2023-022 · s3575.1 |
Delmont Substation Harrison City Substation Hempfield Luxor North Greensburg Substation North Oakford North Oakford Tap Penn South Oakford Tap Stony Springs Junction |
Cost $13.6M In service 6/22/2027 Load ~25 MW |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 16 |
New Customer APS-2023-029 · s3150.2 |
Doubs Lime Kiln Quantum 400 New Sage |
Cost $23.2M In service 12/31/2025 Load approximately 300 MW |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 19 |
Huntingdon – Springdale 138 kV Line APS-2025-006 · s3666.1 |
Huntingdon Substation Springdale |
Cost $4.71M In service 5/1/2028 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 21 |
Bedington – Marlowe 138 kV Line APS-2025-007 · s3667.1 |
Bedington Marlowe Substation |
Cost $4.00M In service 7/26/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 23 |
Hardy – North Petersburg 138 kV Line APS-2025-008 · s3668.1 |
Hardy North Petersburg Substation |
Cost $5.20M In service 7/26/2025 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 27 |
Misoperation Relay Projects APS-2024-114 · s3642.1, s3642.2 |
Buckhannon Substation French Creek |
Cost $7.1 M In service 03/30/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
Misoperation Relay Projects APS-2024-116 · s3643.1, s3643.2 |
Weirton Substation Wylie Ridge Substation |
Cost $7.04 M In service 04/27/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 29 |
Misoperation Relay Projects APS-2024-090 · s3644.1 |
Tiltonsville Windsor |
Cost $1.05 M In service 11/20/2026 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 32 |
Albright Substation APS-2024-072 · s3645.1 |
Albright Substation Snowy Creek Tap |
Cost $1.69 M In service 08/20/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 34 |
Black Oak – Junction 138 kV Line APS-2024-056 · s3646.1, s3642.2, s3642.3 |
Black Oak Junction Substation |
Cost $48.81 M In service 12/14/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 36 |
Arroyo – East Liverpool – Wylie Ridge 138 kV APS-2024-119 · s3647.1 |
Arroyo Junction East Liverpool South Chester Tap Wylie Ridge Substation |
Cost $1.1 M In service 05/09/2025 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 38 |
Pruntytown No. 1 500/138 kV Transformer APS-2024-077 · S3655.1 |
Pruntytown Substation | Cost $ 18.8 M In service 06/13/2031 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 40 |
Pruntytown No. 2 500/138 kV Transformer APS-2024-078 · S3653.1 |
Pruntytown Substation | Cost $ 18.8 M In service 12/13/2030 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 42 |
Wylie Ridge No. 7 500/345 kV Transformer APS-2024-080 · S3654.1 |
Wylie Ridge Substation | Cost $ 20 M In service 12/13/2030 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 44 |
Frederick A – Monocacy 230 kV Line APS-2025-001 · S3656.1 |
Frederick A Substation Monocacy Substation |
Cost $ 3.9 M In service 11/24/2027 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 46 |
Misoperation Relays APS-2024-104 · S3657.1, S3657.2, S3657.3 |
Brownsville Jct Charleroi Emerald Substation Gates Hill Substation |
Cost $6.17 M In service 07/02/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 49 |
Fairview – Whiteley 138 kV APS-2025-010 · S3658.1 |
Blacksville No. 1 Tap Fairview Miracle Run Tap Whiteley |
Cost $1.3 M In service 08/21/2026 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 51 |
Misoperation Relay Projects APS-2024-098 · s3707.1 |
Bethel Park Substation St Clair |
Cost $4.5 In service 7/27/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 51 |
Misoperation Relay Projects APS-2024-099 · s3708.1 |
Cherry Run McConnellsburg Warfordsburg |
Cost $2.5 In service 7/13/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 51 |
Misoperation Relay Projects APS-2024-100 · s3709.1 |
Harwick Houseville Substation |
Cost $3.4 In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 51 |
Misoperation Relay Projects APS-2025-015 · s3710.1 |
Carnegie Tidd Weirton Substation |
Cost $1.9 In service 12/31/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 55 |
Misoperation Relay Projects APS-2024-014 · s3711.1 |
Millville Sleepy Hollow |
Cost $2.00 M In service 01/31/2027 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 55 |
Misoperation Relay Projects APS-2024-047 · s3712.1 |
Cherry Run Morgan |
Cost $2.30 M In service 07/21/2029 |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 55 |
Misoperation Relay Projects APS-2025-018 · s3713.1 |
Black Oak Cross School |
Cost $4.55 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 3 |
Abbe – Medina 69 kV Line Customer Connection - s2056 Scope Change ATSI-2019-056 (s2056) · s2056 |
Abbe Medina |
Cost $0.9 M In service 12/31/2024 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 5 |
Angola – Midway 138 kV Line ATSI-2022-013 · s3543.1 |
Angola Hawthorne Midway |
Cost $11.6M In service 3/14/2028 Load 38.5 MW |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 7 |
Longview – Nottingham 138 kV Line Customer Connection ATSI-2024-039 · s3544.1 |
Longview Nottingham |
Cost $1.5 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 9 |
Glenmount 138 kV Substation ATSI-2023-009 · s3546.1 |
Dale Firestone Glenmount New Lakemore South Akron Toronto |
Cost $23.54 M In service 12/31/2027 Load 55 MW |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 14 |
Cardington (Galion) 138 kV Line Customer Connection ATSI-2024-040 · s3545.1 |
Cardington Galion |
Cost $2.8 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 16 |
Gilchrist – Star 69 kV Line ATSI-2022-028 (s3359.1) · s3359.1 |
Dale Gilchrist Martin Star |
Cost $71.7 M In service 12/1/2027 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 19 |
Beaver No. 1 345/138 kV Transformer ATSI-2018-004 (s1757) · s1757 |
Beaver | Status Conceptual Engineering Cost 10.0 M In service 4/23/2029 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 22 |
Campbellsport-Ravenna No.1 69 kV Line ATSI-2023-002 · s3576.1 |
Campbellsport Ravenna Sumner Substation |
Cost $6.7 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 25 |
West Chippewa 69 kV Substation (s1717) · s1717 |
Chippewa substation New Castle State Line West Chippewa substation New |
Cost $34 M In service 12/31/2025 Load 36 MWs |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
New Departure 345 kV Customer Connection ATSI-2024-056 · s3660.1 |
Davis Besse Ford Greenfield Hayes Nasa New Departure |
Cost $99.1 M In service November 28, 2029 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 32 |
Avon – Fowles Q1 138 kV Customer ATSI-2024-048 · s3659.1 |
Avon Bentley Fowles |
Cost $0.10M In service 05/14/2026 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 34 |
Ellsworth Substation – s1952 Scope Change ATSI-2019-008 · s1952 |
Berlin Lake Boardman Ellsworth Substation Kimberly Salt Springs |
Cost $36.3M In service 4/30/2027 Load 19 MW |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 37 |
Brush Wellman – Genoa 69 kV Line ATSI-2019-089 · s3669.1 |
Brush Wellman Genoa |
Cost $32.27M In service 6/1/2027 Load 20 MWs |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 39 |
Bellevue-Groton 69 kV Line ATSI-2023-013 · s3648 |
Bellevue Groton |
Cost $10.1M In service 06/01/2026 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 41 |
Niles – Shenango 345 kV Line ATSI-2024-006 · s3714.1 |
Niles Substation Shenango |
Cost $73.92M In service 12/17/2027 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 43 |
Beaver Valley – Hanna 345 kV Line and Hanna – Mansfield 345 kV Line ATSI-2024-013 · s3715.1 |
Beaver Valley Hanna Mansfield |
Cost $53.35M In service 5/31/2028 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 45 |
Bayshore – Davis Besse 345 kV Line ATSI-2024-019 · s3716.1 |
Bayshore Davis Besse |
Cost $21.12M In service 05/28/2027 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 47 |
Sammis – Star 345 kV Line ATSI-2024-027 · s3717.1 |
Sammis Star |
Cost $343.70M In service 5/30/2031 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 49 |
Campbellsport – Ravenna No. 2 69 kV Line ATSI-2022-029 · s3718.1 |
Campbellsport Ravenna |
Cost $6.77M In service 5/26/2026 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 51 |
Black River – Johnson West 69 kV Line ATSI-2025-011 · s3719.1 |
Black River Johnson West |
Cost $1.66M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 53 |
Gates – Johnson 138 kV Line ATSI-2025-015 · s3720.1 |
Gates Johnson |
Cost $1.96M In service 12/29/2028 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Waugh Chapel Circuit Breaker B4 BGE-2024-002 · s3560.1 |
Waugh Chapel | Status Construction (Under construction) Cost $0.7M In service 4/10/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Waugh Chapel Circuit Breaker B7 BGE-2024-003 · s3561.1 |
Waugh Chapel | Status Engineering Cost $0.7M In service 10/9/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Waugh Chapel Circuit Breaker B10 BGE-2024-004 · s3562.1 |
Waugh Chapel | Status Engineering Cost $0.7M In service 5/15/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Waugh Chapel Circuit Breaker B12 BGE-2024-005 · s3563.1 |
Waugh Chapel | Status Engineering Cost $0.7M In service 11/13/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
Windy Edge Circuit Breaker B3 BGE-2024-006 · s3564.1 |
Windy Edge | Status In-service (In service) Cost $0.7M In service 4/3/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Windy Edge Circuit Breaker B4 BGE-2024-007 · s3565.1 |
Windy Edge | Status Engineering Cost $0.7M In service 5/8/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 14 |
Windy Edge Circuit Breaker B24 BGE-2024-008 · s3566.1 |
Windy Edge | Status Engineering Cost $0.7M In service 12/11/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 16 |
Windy Edge Circuit Breaker B28 BGE-2024-009 · s3567.1 |
Windy Edge | Status Engineering Cost $0.7M In service 10/2/2025 |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 18 |
Granite Circuit Breaker B2 BGE-2024-010 · s3568.1 |
Granite | Status Engineering Cost $0.7M In service 5/1/2025 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Customer in Hoffman Estates ComEd-2024-005 · s3578.1 |
Tollway | Status Engineering Cost $3M In service 12/31/26 Load 324 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Customer in Elk Grove ComEd-2023-005 · s3579.1 |
TSS Elk Grove | Status Engineering Cost $130.9M In service 8/30/26 Load 270 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Elmhurst ComEd-2024-013 · s3580.1, s3580.2 |
Elmhurst | Status Engineering Cost $6M In service Phase 1: 8/1/2025, Phase 2: 6/1/2027 Load 103 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Customer in Itasca ComEd-2023-009 · s3581.1 |
Itasca | Status Engineering Cost $9.9M In service 12/1/26 Load 272.7 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
Customer in Elk Grove ComEd-2023-008 · s3582.1, s3582.2 |
Des Plaines Elk Grove Lombard Rolling Meadows Schaumburg |
Status Engineering Cost $158M In service 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) Load 378 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 13 |
Customer in Elk Grove ComEd-2024-004 · s3583.1, s3583.2 |
Elk Grove East Itasca |
Status Engineering Cost $40.6M In service 12/31/2026 (s3583.1), 12/31/2027 (s3583.2) Load 260 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 15 |
Customer in Elk Grove ComEd-2024-003 · s3584.1, s3584.2 |
ComEd Dierking ComEd Elk Grove East ComEd Itasca ComEd Pine |
Status Conceptual Cost $289.4M In service 12/31/2027 (s3584.1), 12/31/2028 (s3584.2) Load 250 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 18 |
Burnham 345kV BT1-2 CB ComEd-2024-018 · s3585.1 |
Burnham Sheffield |
Status In Service Cost $2.1M In service 12/31/24 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 20 |
Burnham 345kV BT2-13 CB ComEd-2024-019 · s3586.1 |
Bloom Burnham |
Status Engineering Cost $2.1M In service 12/31/25 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 22 |
Burnham 345kV BT12-13 CB ComEd-2024-020 · s3587.1 |
Burnham Davis Creek State Line |
Status Engineering Cost $2.1M In service 12/31/26 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 24 |
Customer in Aurora ComEd-2024-002 · s3592.1 |
Electric Junction | Status Engineering Cost $0M In service 12/31/26 Load 130 MW |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 26 |
Dresden 345kV BT4-8 CB ComEd-2024-017 · s3725.1 |
Dresden | Status Engineering Cost $2.7M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
Devon Hardening ComEd-2025-003 · s3726.1 |
Devon Northwest Rosehill Skokie |
Status Engineering Cost $ 18.9 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 30 |
138 kV L10301 Wave Trap at Lombard ComEd-2025-001 · s3727.1 |
Lisle Lombard |
Status In-Service (In service) Cost $ 0.15 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 32 |
138 kV L10302 Wave Trap at Lombard ComEd-2025-002 · s3728.1 |
Lisle Lombard |
Status Conceptual Cost $ 0.15 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Miami Fort – Clifty Creek DEOK-2023-001 · s3598.1 |
Clifty Creek Miami Fort |
Status Engineering Cost $39.0 MM In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Markley DEOK-2024-003 · s3599.1 |
Markley | Status Engineering Cost $1,080,019 In service 12/11/2026 |
| 2025-10-08 | TEAC Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Turfway DEOK-2024-004 · s3600.1 |
Aero Constance Donaldson Limaburg Oakbrook Turfway New Woodspoint |
Status Scoping (Conceptual) Cost $13M In service 07/25/2029 |
| 2025-10-08 | TEAC Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Trenton Load Request DEOK-2024-006 · s3601.1 |
Woodsdale | Status Scoping (Conceptual) Cost $36.2M In service 03/01/2026 Load 500 MW |
| 2025-10-08 | TEAC Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Carson Substation Breakers DLC-2025-001 · s3650 |
Carson Substation | Status Planning (Conceptual) Cost $1.6 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Dravosburg Substation Breaker DLC-2025-002 · s3651 |
Dravosburg Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Findlay Substation Breaker DLC-2025-003 · s3652 |
Findlay Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Neville Substation Breaker DLC-2025-004 · s3649 |
Neville Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 2 |
Devlin 230kV Delivery – NOVEC DOM-2023-0013 · s3693.1 |
Dawkins Branch Devlin New Vint Hill |
Status Engineering Cost $42.0 M In service 05/01/2026 Load 111.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 4 |
Centreport 230kV Delivery - DEV DOM-2024-0005 · s3695.1 |
Centreport New Cranes Corner Spartan |
Status Conceptual Cost $30.0 M In service 07/01/2027 Load 136 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 6 |
Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines DOM-2024-0035 · s3701 |
Allman New Aquia Harbour Cranes Corner Fredericksburg Possum Point |
Status Conceptual Cost $180.0M In service 06/01/2029 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 10 |
Do No Harm Analysis DOM-2023-0013-DNH · s3693.2, s3693.3 |
Dawkins Branch Devlin Pegasus |
Status Conceptual Cost $88.0M In service 06/15/2029 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 12 |
Pegasus 230kV Delivery – NOVEC DOM-2024-0047 · s3700 |
Hornbaker Liberty Pegasus New Pioneer |
Status Engineering Cost $28.5M In service 04/14/2027 Load 87.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 14 |
Bristow 230kV Delivery – NOVEC DOM-2024-0063 · s3699 |
Bristow New Hornbaker Nokesville |
Status Engineering Cost $14.0M In service 04/30/2028 Load 213.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 16 |
Meadowville 230kV Delivery - DEV DOM-2024-0023 · s3671 |
Meadowville New Sloan Drive New |
Status Engineering Cost $36.9M In service Q1 2028 Load 300.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 18 |
White Mountain 230kV Delivery - DEV DOM-2024-0024 · s3672 |
Sloan Drive New White Mountain New |
Status Engineering Cost $19.0M In service Q1 2028 Load 100.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 20 |
Customer Load Request DOM-2019-0021, DOM-2024-0022, DOM-2024-0023, DOM-2024-0024 - DNH · s3672.2, s3672.3, s3672.4 |
Enon substation Meadowville New Sycamore Springs New |
Status Engineering Cost $92.7M In service Q4 2028 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 22 |
Equipment Material Condition, Performance and Risk DOM-2024-0013 · s3597 |
Ahoskie Substation Earleys Tunis |
Status Conceptual Cost $50M In service 12/31/2028 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 24 |
Thicket 230kV Delivery - DEV DOM-2024-0018 · s3673 |
Bermuda Hundred New Chickahominy Darbytown Elko Elmont Techpark Place Thicket New White Oak |
Status Engineering Cost $20M Substation, $5M Transmission Line In service Q4 2027 Load 255.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 26 |
Saltwood 230kV Delivery - DEV DOM-2024-0020 · s3674 |
Saltwood New Thicket New |
Status Engineering Cost $20M Substation, $20M Transmission Line In service Q3 2027 Load 300.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 28 |
Bunker 230kV Delivery - DEV DOM-2024-0040 · s3675 |
Bunker New Saltwood New Thicket New |
Status Engineering Cost $15M Substation, $6M Transmission Line In service Q4 2027 Load 104.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 30 |
Gray Bark 230kV Delivery - DEV DOM-2024-0019 · s3676 |
Chickahominy Gray Bark New Portugee Saltwood New |
Status Engineering Cost $20M Substation, $20M Transmission Lines In service Q3 2027 Load 300.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 32 |
Duval 230kV Delivery - DEV DOM-2024-0031 · s3677 |
Duval New Midlothian |
Status Engineering Cost $30.0M Substation, $80M Transmission Lines In service 1/1/2028 Load 76.9 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 34 |
Replace Landstown TX#1 - DEV DOM-2024-0086 · s3678 |
Landstown | Status Engineering Cost $5.1 M In service 12/31/2025 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 36 |
Replace Landstown TX#2 - DEV DOM-2024-0087 · s3679 |
Landstown | Status Engineering Cost $4.76 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 38 |
Mountain Run 230kV Delivery - REC DOM-2022-0034 (Update) · s3680 |
Cirrus New Culpeper Kyser New Mountain Run Mountain Run 3 New Technology New |
Status Engineering Cost $60 M In service Q4 2027 Load 298 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 40 |
Palomino 230kV Delivery - DEV DOM-2024-0085 · s3681 |
Cirrus New Palomino Sub New |
Status Conceptual Cost $38.6M In service Q2 2028 Load 120 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 42 |
Chandler 230kV Delivery - DEV DOM-2024-0082 · s 3682 |
Chandler Sub New Palomino Sub New |
Status Conceptual Cost $20.8M In service Q2 2028 Load 112 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 44 |
McDevitt 230kV Delivery - DEV DOM-2024-0083 · s3683 |
Chandler Sub New McDevitt New |
Status Conceptual Cost $19.8M In service Q2 2028 Load 118 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 46 |
Mt Pony 230kV Delivery - DEV DOM-2024-0084 · s3684 |
McDevitt New Mt. Pony Sub New |
Status Conceptual Cost $39.8M In service Q2 2028 Load 160 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 48 |
Do No Harm Analysis DOM-2024-0084-DNH · s3684 |
Oak Green Sub Potato Run Remington |
Status Conceptual Cost $140.8M In service Q2 2028 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 50 |
230kV Line 2021 – EOL Rebuild DOM-2024-0025 · s3685 |
Elizabeth City Shawboro |
Status Engineering Cost $30.6M In service 5/30/2025 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 52 |
Trabue 230kV Delivery - DEV DOM-2025-0001 · s3687 |
Trabue Substation | Status Engineering Cost $10.1M In service 1/1/2026 Load 100 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 54 |
Enon 230kV Delivery - DEV DOM-2025-0010 · s3688 |
Enon substation | Status Engineering Cost $1.6M In service 3/1/2028 Load 88.9 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 58 |
Do No Harm Analysis DOM-2024-0023 - DNH · s3671 |
Carson Clubhouse Hopewell Meadowville Sycamore Springs New |
Status Conceptual Cost Lines 211 and 228: $33M Line 238: $112M In service Q4 2030 Load 300MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 60 |
Nebula 230kV Delivery - MEC DOM-2024-0054 · s3686 |
Cloud Nebula New Raines |
Status Engineering Cost $48.6M In service 11/01/2028 Load 26 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 62 |
Do No Harm Analysis DOM-2024-0063-DNH · s3699.3, s3699.4, s3699.5 |
Devlin Gainesville Vint Hill Wheeler |
Status Conceptual Cost $24.0M In service 06/01/2029 |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 64 |
Tributary 230kV Delivery - REC DOM-2024-0009 · s3721 |
Ladysmith CT New Post Tributary New |
Status Engineering Cost $32.3M In service 04/01/2027 Load 108 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 66 |
South Fork 230kV Delivery - NOVEC DOM-2023-0002 · s3722 |
Loudoun Racefield Reed Farm New |
Status Engineering Cost $19.0M In service 09/30/2026 Load 162.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 68 |
Cloverhill - Add 4th and 5th TX - DEV DOM-2024-0059 · s3696.1 |
Cloverhill Substation | Status Engineering Cost $1.0 M In service 03/01/2027 Load 191.3 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 70 |
Park Center 230kV Delivery - DEV DOM-2020-0043- UPDATE · s2622.1 |
Dulles Lincoln Park Park Center New Reston |
Status Engineering Cost $27.0 M In service 11/21/2025 Load 41.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 72 |
Lost City 230kV Delivery - DEV DOM-2024-0041 · s3698.1 |
Lost City New | Status Engineering Cost $5.0M In service 06/01/2026 Load 187.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 74 |
Towerview 230kV Delivery - DEV DOM-2023-0004 · s3670 |
Park Center Reston Towerview New |
Status Engineering Cost $13.0 M In service 11/30/2027 Load 300.0 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 76 |
NIT Substation 230kV Delivery - DEV DOM-2023-0006 · s3697.1 |
Churchland NIT New Sewells Point |
Status Construction (Under construction) Cost $5.7 M In service 12/31/2024 Load 49.3 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 78 |
Old Limb 230kV Delivery – DEV DOM-2024-0015 · s3704.1 |
Gainesville Heathcote Loudoun Old Limb New Youngs Branch |
Status Engineering Cost $35.0 M In service 8/01/2027 Load 148 MW |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 80 |
Brickyard - Add 3rd and 4th TX - DEV DOM-2024-0048 · s3705.1 |
Brickyard | Status Engineering Cost $1.0 M In service 12/01/2026 Load 164.4 MW |
| 2025-10-08 | TEAC Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Zachariah, KY EKPC-2024-001 · s3689.1 |
Bowen High Rock Powell County Zachariah |
Status Engineering Cost $16.56 M In service 12/31/2029 |
| 2025-10-08 | TEAC Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Munfordville, KY EKPC-2024-002 · s3690.1-.3 |
Bonnieville Cub Run New Munfordville |
Status Engineering Cost $1.579 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Cooper, KY EKPC-2024-004 · s3692.1 |
Cooper | Status Engineering Cost $0.656 M In service 06/01/2026 |
| 2025-10-08 | TEAC Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Dale Station 69 & 138 kV Substation EKPC-2024-003 |
Dale Newby Distribution |
Status Engineering Cost $8.8M In service 6/1/2029 |
| 2025-10-08 | TEAC Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
Dale – Newby 69 KV EKPC-2022-004 · s2873 |
Crooksville Dale Fawkes Lancaster Newby Newby Distribution Toddville West Berea |
Status Engineering Cost $22.9M In service 6/1/2029 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
JCPL Transmission Zone M-3 Process Whippany, NJ/Montville, NJ/Greystone, NJ JCPL-2019-024 · s3609.1 |
Alderney Davis Greystone Montville Morris Plains Morris Plains Tap Morristown Morristown Tap Tabor Tap Whippany |
Cost $20.1 M In service 06/11/2027 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
JCPL Transmission Zone M-3 Process Morris Park Substation JCPL-2023-011 · s3611.1 |
Gilbert Martins Creek Morris Park Pequest River |
Cost $15.4M In service 1/29/2027 Load 13 MW |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
JCPL Transmission Zone M-3 Process Chester No. 1 230-34.5 kV Transformer JCPL-2024-003 · s3610.1 |
Chester Substation Kittatinny Pohatcong West Wharton |
Cost $7.3 M In service 11/12/2027 Load 30 MW |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
JCPL Transmission Zone M-3 Process Whippany No. 12 230/115 kV Transformer JCPL-2024-019 · s3613.1 |
Whippany | Cost $8.1 M In service 03/07/2030 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
JCPL Transmission Zone M-3 Process Windsor No. 3 230-34.5 kV Transformer JCPL-2024-020 · s3615.1 |
Windsor | Cost $9.7M In service 12/22/2028 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
JCPL Transmission Zone M-3 Process Chester No. 4 230-34.5 kV Transformer JCPL-2024-021 · s3617.1 |
Chester Substation | Cost $7.3 M In service 12/31/2029 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 14 |
JCPL Transmission Zone M-3 Process Larrabee No. 3 230-34.5 kV Transformer JCPL-2024-023 · s3619.1 |
Larrabee | Cost $7.3 M In service 04/12/2027 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 16 |
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer JCPL-2024-025 · s3612.1 |
Vernon | Cost $7M In service 8/31/2029 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 18 |
JCPL Transmission Zone M-3 Process Deep Run No. 2 115-34.5 kV Transformer JCPL-2024-026 · s3614.1 |
Deep Run Substation | Cost $8M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 20 |
JCPL Transmission Zone M-3 Process Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers JCPL-2024-027 · s3616.1 |
Gilbert | Cost $8M In service 12/31/2028 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 22 |
JCPL Transmission Zone M-3 Process Englishtown No. 1 115-34.5 kV Transformer JCPL-2024-028 · s3618.1 |
Englishtown | Cost $7M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 24 |
JCPL Transmission Zone M-3 Process Raritan River (Sayreville), NJ JCPL-2024-029 · s3639.1 |
Raritan River Substation | Cost $6.91 M In service 03/30/2029 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 26 |
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection JCPL-2024-034 · s3621.1 |
Coke McGraw Hill Windsor Wyckoff Street |
Cost $54M In service 7/24/2027 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
JCPL Transmission Zone M-3 Process Franklin No. 1 115-34.5 kV Transformer JCPL-2024-036 · s3636.1 |
Franklin | Cost $6M In service 12/28/2029 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 30 |
JCPL Transmission Zone M-3 Process Pequest River No. 1 115-34.5 kV Transformer JCPL-2024-037 · s3638.1 |
Pequest River | Cost $6.9 M In service 01/30/2030 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 32 |
JCPL Transmission Zone M-3 Process Glen Gardner No. 2 230-34.5 kV Transformer JCPL-2024-043 · s3620.1 |
Glen Gardner | Cost $7.5 M In service 05/01/2025 |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 34 |
JCPL Transmission Zone M-3 Process Automatic Restoration Projects JCPL-2024-052 · s3637.1 |
Jacksonville Tap Montville Riverdale |
Cost $0.15 M In service 07/05/2026 |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Middletown Junction – Swatara Hill – Campbelltown 69 kV Line ME-2019-009 · s3622.1 |
Campbelltown Substation Middletown Junction Swatara Hill |
Cost $25.4 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
New Customer Connection ME-2019-053 · s3623.1 |
Middletown Junction Raintree Smith Street Willis Road |
Cost $12.5M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Cleona Substation ME-2023-013 · s3625.1 |
Cleona North Lebanon West Lebanon |
Cost $9.5M In service 6/8/2026 Load 11 MW |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Mountain Substation ME-2023-017 · s3605.1, s3605.2 |
Gardners Mountain PPGI |
Cost $11.4M In service 12/31/2026 Load 31.8 MW |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
North Hershey Substation ME-2023-022 · s3624.1 |
North Hershey | Cost $16.31M In service 12/17/2027 |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Belfast Substation ME-2024-014 · s3626.1 |
Belfast Glendon North Bangor Northwood |
Cost $14.3M In service 6/1/2028 Load 78 MW |
| 2025-10-08 | TEAC Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 14 |
Alcoa – Broad Street 69 kV Line Customer Connection ME-2024-018 · s3627.1 |
Alcoa Broad St. Broad Street North Cornwall |
Cost $1.19 M In service 11/24/2025 Load 39 MVA |
| 2025-10-08 | TEAC Informational Only - PECO Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Byberry 6th 138/13 kV Transformer PE-2024-004 · s3661.1 |
Byberry | Status Conceptual Cost $0.85 M In service 6/1/2028 |
| 2025-10-08 | TEAC Informational Only - PECO Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Byberry #150 138kV Circuit Breaker Replacement PE-2024-005 · s3662.1 |
Byberry | Status Conceptual Cost $0.55 M In service 6/1/2028 |
| 2025-10-08 | TEAC Informational Only - PECO Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Neshaminy 138kV Station Reconfiguration PE-2024-006 · s3663.1 |
Neshaminy | Status Conceptual Cost $4.2 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - PECO Local Plan Submission of the Supplemental Projects for 2025 p. 9 |
Peach Bottom Unit #2 Relay Replacement PE-2024-007 · s3665.1 |
Peach Bottom | Status Complete Cost $836,000 In service 11/3/2024 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Piney Substation PN-2020-004, APS-2020-003 · s3628.1 |
Eclipse Substation Grandview Substation Piney Substation |
Cost $11.4M In service 01/12/2026 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Perry – Ashtabula – Erie West 345 kV Line PN-2023-029 · s3702.1 |
Ashtabula Erie West |
Cost $52.4 M In service 5/31/2027 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 9 |
SGC Tap - Summit 46 kV Line PN-2024-002 · s3629.1 |
None named | Cost $3.54 M In service 05/29/2026 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 11 |
Altoona - Hollidaysburg 46 AH kV Line PN-2024-005 · s3634.1 |
Altoona Hollidaysburg |
Cost $2.21 M In service 12/01/2027 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 13 |
Tyrone North – Tipton 46 kV Line PN-2024-006 · s3635.1 |
Tipton Substation Tyrone North Substation |
Cost $2.92 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 15 |
Glade Substation PN-2024-013 · s3631.1 |
Forest Substation Glade Substation Lewis Run Substation Warren |
Cost $12 M In service 12/17/2027 |
| 2025-10-08 | TEAC Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 17 |
Glory – Nanty Glo – Spangler 46 kV Switches PN-2024-026 · s3633.1 |
None named | Cost $1.86 M In service 11/13/2026 |
| 2025-10-08 | TEAC Informational Only - PEPCO Local Plan Submission of the Supplemental Projects for 2025 p. 3 |
Mt. Zion 230kV Breakers PEP-2024-003 · s3572.1, s3572.2, s3572.3, s3572.4 |
Mt. Zion Substation | Status Engineering Cost $22M In service 6/1/2030 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Beavertown, PA PPL-2019-0003 · s3554.1 |
Beavertown Middleburg Sunbury |
Status Conceptual Cost $33 M In service 05/31/2028 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Donnelley, PA PPL-2024-0011 · s3548 |
Dillerville North Lancaster New Prince South Akron West Hempfield |
Status Conceptual Cost $67.5 M In service 06/01/2028 Load 350 MW |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
Harwood, PA PPL-2024-0012 · s3549 |
Harwood Slykerville New Susquehanna Tresckow |
Status Conceptual Cost $73.3 M In service 05/30/2028 Load 1,000 MW |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Alburtis, PA PPL-2024-0013 · s3550 |
Alburtis | Status Conceptual Cost $19.9 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
Wescosville, PA PPL-2024-0014 · s3551 |
Wescosville | Status Conceptual Cost $15.5 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Lackawanna, PA PPL-2024-0015 · s3552 |
Lackawanna | Status Conceptual Cost $6.3 M In service 12/31/2026 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 14 |
Blooming Groove, PA PPL-2024-0016 · s3553 |
Blooming Grove | Status Conceptual Cost $6.3 M In service 12/31/2027 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 16 |
Tresckow, PA PPL-2024-0004 · s3555 |
East Palmerton Harwood Siegfried Tresckow New |
Status Conceptual Cost $81 M In service 05/31/2027 Load 1,000 MW |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 18 |
Hamilton, PA PPL-2024-0006 · s3556 |
ATTR Breinigsville Tek Park New |
Status Conceptual Cost $9 M In service 06/01/2027 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 20 |
Summit, PA PPL-2024-0007 · s3557 |
Stanton Summit |
Status Conceptual Cost $17.5 M In service 12/01/2027 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 22 |
Old Forge, PA PPL-2024-0008 · s3558 |
Avoca Old Forge |
Status Conceptual Cost $5.5 M In service 12/01/2027 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 24 |
Exeter, PA PPL-2024-0009 · s3559 |
Exeter Stanton Swoyerville |
Status Conceptual Cost $17.5 M In service 12/01/2027 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 26 |
Donnelley Gravure, PA PPL-2024-0010 · s3547 |
Engleside Greenland Lampeter New Millwood Pitney New Prince South Akron Strasburg |
Status Conceptual Cost $117.8 M In service 06/01/2028 Load 350 MW |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
New Buffalo, PA PPL-2024-0017 · s3571 |
Alburtis Juniata New Buffalo New |
Status Conceptual Cost $242 M In service 05/30/2028 Load 1,000 MW |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 30 |
Grand Landmark, PA PPL-2024-0005 · s3640 |
Palooka Wright |
Status Conceptual Cost $17.75 M In service 05/01/2028 |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 32 |
Susquehanna, PA PPL-2025-0003 · s3706 |
Sunbury Susquehanna Susquehanna T10 |
Cost $19.4 M In service 05/30/2028 Load 1,440 MW |
| 2025-10-08 | TEAC Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
PSE&G Transmission Zone M-3 Process
Newark Bay Area PSEG-2023-0005 · s3007.1 |
Bayonne PVSC |
Status Engineering and Planning (Engineering) Cost $25.6M In service 12/2025 |
| 2025-10-08 | TEAC Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
PSE&G Transmission Zone M-3 Process
South Brunswick PSEG-2024-0005 · s3570 |
Ridge Road Station West Windsor Station |
Status Engineering and Planning (Engineering) Cost $3.4M In service 06/30/2026 Load 35 MW |
| 2025-10-08 | TEAC Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 6 |
PSE&G Transmission Zone M-3 Process
Lumberton Area PSEG-2023-0011 · s3569 |
Cookstown Lumberton Pemberton New |
Status Engineering and Planning (Engineering) Cost $64.5M In service 12/2029 |
| 2025-10-08 | TEAC Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
PSE&G Transmission Zone M-3 Process
East Rutherford Area PSEG-2024-0002 · s3604 |
East Rutherford | Status Engineering and Planning (Engineering) Cost $43.1M In service 5/31/2028 |
| 2025-10-08 | TEAC Informational Only - WVPA Local Plan Submission of the Supplemental Projects for 2025 p. 2 |
Elderberry, IN/Stillwell, IN WVPA-2025-001 · s3632.1-2 |
Elderberry Substation Stillwell substation |
Cost $0M ($80 M covered by MISO) In service 12/31/2028 |
| 2025-10-08 | TEAC Item 05 - JCPL Supplemental Projects p. 3 |
Leisure Village 230 kV Substation JCPL-2024-001 |
Cedar Bridge Drum Point Lakewood Leisure Village Manitou Silverton South Lakewood |
Status Conceptual Cost $ 50.23M In service 06/01/2029 Load 52 MW |
| 2025-10-08 | TEAC Item 06 - Penelec Supplemental Projects p. 3 |
Johnstown - Seward 230 kV Line PN-2025-007 |
Johnstown Seward |
No figures printed |
| 2025-10-08 | TEAC Item 06 - Penelec Supplemental Projects p. 5 |
Forest - Glade 230 kV FG Line PN-2024-014 |
Forest Substation Glade Substation |
Status Conceptual Cost $ 156.72M In service 05/31/2029 |
| 2025-10-08 | TEAC Item 06 - Penelec Supplemental Projects p. 7 |
Shelocta 230/115 kV Substation PN-2025-002 |
Shelocta | Status Conceptual Cost $ 0.25M In service 05/06/2026 |
| 2025-10-08 | TEAC Item 07 - AEP Supplemental Projects p. 3 |
Olive, IN AEP-2025-IM007 |
Navistar New | In service June 2029 Load 692MW |
| 2025-10-08 | TEAC Item 07 - AEP Supplemental Projects p. 4 |
Marysville, OH/Flatlick, OH AEP-2025-OH022 |
None named | In service 08/14/2029 Load 750 MW |
| 2025-10-08 | TEAC Item 08 - Dayton Supplemental Projects p. 3 |
Dayton-2025-009 | Airport Substation | In service 03/2030 Load 300 MW |
| 2025-10-08 | TEAC Item 09 - PPL Supplemental Projects p. 3 |
Lackawanna, PA PPL-2025-0013 |
Callender Gap Lackawanna Sturges New Sturgis Summit |
Status Conceptual Cost $74.9 M In service 07/30/2028 Load 1,400 MW |
| 2025-10-08 | TEAC Item 09 - PPL Supplemental Projects p. 5 |
Gordon, PA PPL-2025-0008 |
Eldred Frackville Gordon New Sunbury |
Status Conceptual Cost $231.65M In service 5/30/2027 Load 600 MW |
| 2025-10-08 | TEAC Item 10 - PECO Supplemental Projects p. 3 |
PE-2025-004 | None named | Load 600 MW |
| 2025-10-08 | TEAC Item 10 - PECO Supplemental Projects p. 4 |
PE-2025-005 | North Philadelphia | No figures printed |
| 2025-10-08 | TEAC Item 11 - ComEd Supplemental Projects p. 3 |
Plano 345 kV BT 5-6 CB ComEd-2025-022 |
Plano | No figures printed |
| 2025-10-08 | TEAC Item 11 - ComEd Supplemental Projects p. 5 |
Lockport 345 kV BT 1-2 CB ComEd-2025-018 |
Lockport Lombard |
Status Engineering Cost $2.2M In service 12/31/2025 |
| 2025-10-08 | TEAC Item 11 - ComEd Supplemental Projects p. 8 |
Customer in Dekalb ComEd-2024-001 · s3342.1, s3342.2 |
Keslinger New | Status Engineering Cost $215M In service 12/31/27 Load 210 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0032 |
Mudd Tavern New | In service 8/1/2029 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0054 |
West Creek New | In service 1/2/2029 Load 100 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0042 |
Sky Lark New | In service 12/31/2030 Load 202 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 6 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0043 |
Diamond Hill New | In service 12/01/2031 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0044 |
Javelin New | In service 12/31/2030 Load 168 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 8 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0045 |
Antique New | In service 12/31/2030 Load 70 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 9 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0047 |
Acadian New | In service 12/31/2030 Load 30 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 10 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0050 |
Artemis New | In service 12/30/2031 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 11 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0055 |
Hera New | In service 12/30/2031 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 12 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0056 |
Atlas | In service 12/31/2030 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 13 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0057 |
Nero New | In service 12/30/2030 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 14 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0068 |
Caesar New | In service 12/30/2030 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 15 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0061 |
Phobos New | In service 12/01/2029 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 16 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0062 |
Deimos New | In service 12/01/2029 Load 240 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 17 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0063 |
Lenticular New | In service 12/31/2029 Load 290 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 18 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0064 |
Fractus New | In service 06/19/2029 Load 244 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 19 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0065 |
Radar New | In service 05/30/2030 Load 168 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 20 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0066 |
Celtic New | In service 12/30/2030 Load 117 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 21 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0069 |
Summerhouse New | In service 12/31/2030 Load 280 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 22 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0070 |
None named | In service 05/01/2028 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 23 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0071 |
None named | In service 08/01/2027 Load 176 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 24 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0072 |
None named | In service 03/01/2029 Load 270 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 25 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0046 |
None named | In service 6/30/2030 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 26 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0049 |
Surveyors New | In service 12/31/2031 Load 300 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 27 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0052 |
Dahlgren West New | In service 12/1/2030 Load 300MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 28 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0053 |
Kettler Crossroads New | In service 12/1/2031 Load 300MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 30 |
Dominion Transmission Zone: Supplemental Tropical 230kV Delivery - DEV DOM-2022-0062 |
Tropical New | Status Engineering Cost Transmission Lines: $7.6M; Substation: $25.9M In service Q3 2027 Load 210.0 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 32 |
Dominion Transmission Zone: Supplemental Flamingo 230kV Delivery - DEV DOM-2024-0058 |
Flamingo New | Status Engineering Cost $20.0M Substation, $10M Transmission Lines In service 12/31/2029 Load 47.0 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 34 |
Dominion Transmission Zone: Supplemental Helm 230kV Delivery – DEV DOM-2018-0018 |
Helm Substation New Lucky Hill New |
Status Engineering Cost 14.0M In service 12/30/2030 Load 85.0 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 36 |
Dominion Transmission Zone: Supplemental Burrell 230kV Delivery - NOVEC DOM-2022-0046 |
Burrell Substation New Mint Springs New |
Status Engineering Cost $16.0M In service 12/30/2028 Load 45.7 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 38 |
Dominion Transmission Zone: Supplemental Alto 230kV Delivery - NOVEC DOM-2023-0056 |
Alto Substation New | Status Engineering Cost $16.5M In service 07/02/2027 Load 213.7 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 40 |
Dominion Transmission Zone: Supplemental Baritone 230kV Delivery - NOVEC DOM-2024-0008 |
Alto Substation Baritone Substation New |
Status Engineering Cost $15.5M In service 12/30/2029 Load 32 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 42 |
Dominion Transmission Zone: Supplemental Aphrodite 230kV Delivery - NOVEC DOM-2024-0061 |
Aphrodite New | Status Engineering Cost $14M In service 09/30/2027 Load 92.1 MW |
| 2025-10-08 | TEAC Item 12 - DOM Supplemental Projects p. 44 |
Dominion Transmission Zone: Supplemental Demeter 230kV Delivery - NOVEC DOM-2024-0062 |
Demeter New | Status Engineering Cost $15.5M In service 05/01/2028 Load 17.8 MW |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 5 |
Wilton Center 765/345 kV 2025-W1-906 |
Wilton Center | Cost $45.81 M In service 12/1/2030 |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 7 |
McCanns Rd 138 kV Switching Station 2025-W1-631 |
Bartonville Double Toll Gate Greenwood McCanns Rd New Redbud Stephenson West Winchester |
Cost $23.87 M In service 6/1/2030 |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 9 |
Garrett – Garrett Tap 115 kV 2025-W1-692 |
Deep Creek Garrett Garrett Tap Penn Mar |
Cost $9.15 M In service 6/1/2029 |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 11 |
138 kV line College Corner - Collinsville 2025-W1-156 |
College Corner Collinsville Trenton |
Cost $58.471 M In service 06/2030 |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 14 |
Claymont Substation Bus Upgrade | Claymont Linwood |
Cost $0.031M In service 06-01-2030 |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 15 |
Chichester Relay Upgrade | Chichester Trainer |
Cost $0.031M In service 06-01-2030 |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 16 |
Roseland – Livingston 230kV 2025-W1-656 |
Laurel Ave Livingston Roseland |
Cost $9.93M In service 06-01-2030 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.