Substation Scout

Cherry Valley

Named in 7 PJM planning documents for 4 projects, from October 17, 2025 to October 6, 2026.

Existingdescribed as
COMEDzone
138 kV, 345/138 kV, 345kVkV as printed
7mentions

Also printed as: Cherry Valley substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cherry Valley 345/138 kV Transformer
b3982.1
Not printed $7.74 M 6/1/2030 Not printed 2025-11-14
SRRTEP Western
Cherry Valley 345/138 kV Transformer Not printed $7.74 M 6/1/2030 Not printed 2025-10-17
SRRTEP Western
Customer in Rockford
ComEd-2025-014
Conceptual $92M 1/1/2028 600 MW 2026-02-03
TEAC
Cherry Valley 138 kV 1-2 CB
ComEd-2025-023 · s4011
Conceptual $2.6 M 12/31/2026 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 16
Cherry Valley 138 kV 1-2 CB “Cherry Valley 138 kV 1-2 BT oil circuit breaker was installed in 1969”
138 kV
2026-09-30* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2026 RTEP p. 16
Cherry Valley 138 kV 1-2 CB “Cherry Valley 138 kV 1-2 BT oil circuit breaker was installed in 1969”
138 kV
2026-02-03 TEAC
Item 10 - ComEd Supplemental Projects p. 13
Customer in Rockford No role wording
345kV
2025-11-14 SRRTEP Western
Item 04 - ComEd Supplemental Projects p. 9
Cherry Valley 138 kV 1-2 CB “Cherry Valley 138 kV 1-2 BT oil circuit breaker was installed in 1969. It is in deteriorating condition”
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 23
Cherry Valley 345/138 kV Transformer “install a 138 kV bus 3 cap bank and associated equipment at Cherry Valley substation.”
345/138 kV
2025-10-17 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 3
Cherry Valley 138 kV 1-2 CB “Cherry Valley 138 kV 1-2 BT oil circuit breaker was installed in 1969”
138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 17
Cherry Valley 345/138 kV Transformer “associated equipment at Cherry Valley substation”
345/138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this