Substation Scout

Niles Central

Named in 4 PJM planning documents for 2 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
ATSIzone
138 kVkV as printed
4mentions

Also printed as: Niles Central 138 kV substation · Niles Central 138 kV station · Niles Central Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Niles Central 138 kV substation
AMPT-2025-005 · s3888.1 (AMPT) & s3888.2 (ATSI)
Engineering $14.1M 08/01/2028 63 MW 2026-10-06
TEAC
ATSI Transmission Zone M-3 Process Niles Central – Packard 138 kV Line
ATSI-2024-002 · s3362.1
Not printed $12.6M 12/31/2025 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named MCDONALD STEEL; NILES; NILES CENTRAL → NILES CENTRAL Not reported Not reported
Substations named NILES CENTRAL → MCDONALD STEEL; NILES; NILES CENTRAL 2026-10-06 Not reported
Substations named NILES CENTRAL → MCDONALD STEEL; NILES; NILES CENTRAL 2025-06-13 2026-01-16
Substations named MCDONALD STEEL; NILES; NILES CENTRAL → NILES CENTRAL 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 71
Niles Central 138 kV substation “At AMPT's Niles Central 138 kV substation, a single breaker failure of the 138 kV tiebreaker results in the loss of all load”
138 kV
2026-09-23* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2026 RTEP p. 71
Niles Central 138 kV substation “At AMPT's Niles Central 138 kV substation”
138 kV
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 54
ATSI Transmission Zone M-3 Process Niles Central – Packard 138 kV Line No role wording
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 54
ATSI Transmission Zone M-3 Process Niles Central – Packard 138 kV Line No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this