Youngs Branch
Named in 3 PJM planning documents for 3 projects, from October 8, 2024 to October 8, 2025.
Existingdescribed as
DOMzone
230 kVkV as printed
5mentions
Also printed as: Youngs Branch Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Youngs Branch - Add 2nd TX - DEV DOM-2022-0020 · s3020 |
Under construction | $0.75M | 03/28/2024 | 141.6 MW | 2024-10-08 TEAC |
| Youngs Branch - Add 3rd, 4th, and 5th TX - DEV DOM-2023-0014 · s3065 |
Engineering | $3.0 M | 07/01/2024 | Not printed | 2024-10-08 TEAC |
| Old Limb 230kV Delivery – DEV DOM-2024-0015 · s3704.1 |
Engineering | $35.0 M | 8/01/2027 | 148 MW | 2025-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Southern Dominion p. 125 |
Youngs Branch - Add 3rd, 4th, and 5th TX - DEV | “feed the new transformers at Youngs Branch” |
| 2026-09-08* | SRRTEP Southern Dominion p. 29 |
Youngs Branch - Add 2nd TX - DEV | “feed the new transformer at Youngs Branch” |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 79 |
Old Limb 230kV Delivery – DEV | “existing Youngs Branch Substation” 230 kV |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 125 |
Youngs Branch - Add 3rd, 4th, and 5th TX - DEV | “feed the new transformers at Youngs Branch” |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 28 |
Youngs Branch - Add 2nd TX - DEV | “add a 2nd distribution transformer at Youngs Branch Substation” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.