Named in 13 PJM planning documents for 13 projects, from October 8, 2024 to September 17, 2026.

Existingdescribed as
JCPLzone
230 kV, 230-34.5 kV, 34.5 kVkV as printed
19mentions

Also printed as: Larrabee Substation

PJM interconnection queue

A PJM queue substation page has the same name: Larrabee (NJ) — 11 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations
b3737.2
Not printed Not printed 6/1/2029 Not printed 2026-05-08
TEAC
Metedconk and Vermont Ave 34.5 kV Substations
b4018.5
Not printed Not printed 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Metedconk and Vermont Ave 34.5 kV Substations Not printed $65.74 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Cookstown – Larrabee – Whitings 230 kV Line
JCPL-2022-005 · s3298.1, s3298.2, s3298.3, s3298.4, s3298.5
Not printed $50.4M 12/1/2024 Not printed 2024-10-08
TEAC
Automatic Restoration Projects
JCPL-2023-025 · s3402.1
Not printed Not printed Not printed Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Automatic Restoration Projects
JCPL-2023-030 · s3248.1
Not printed $2.56 12/20/2024 Not printed 2024-10-08
TEAC
Vermont Ave 34.5 kV Customer Connection
JCPL-2023-059 · s3284.1
Not printed $0.3M 03/31/2026 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Smithburg Substation
JCPL-2024-005 · s3329.1
Not printed $30.1 M 06/01/2027 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
JCPL Transmission Zone M-3 Process Larrabee No. 3 230-34.5 kV Transformer
JCPL-2024-023 · s3619.1
Not printed $7.3 M 04/12/2027 Not printed 2025-10-08
TEAC
Manchester 230-34.5 kV Substation
JCPL-2026-001
Not printed Not printed Not printed 23 MW 2026-01-06
TEAC
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection
JCPL-2026-011
Conceptual $8.49 M 02/10/2031 11 MW 2026-09-17
SRRTEP Mid-Atlantic
Customer Connection - Larrabee-Point Pleasant No. 2 34.5 kV R44 Line, NJ
JCPL-2026-023
Conceptual $540,000 08/12/2027 0.66 MW 2026-09-17
SRRTEP Mid-Atlantic
Lakewood, NJ
JCPL-2026-026
Conceptual $292.4M 12/31/2032 Not printed 2026-07-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named COOKSTOWN; LARRABEE; WHITINGS → COOKSTOWN; LARRABEE; MANCHESTER; WHITINGS 2024-10-08 Not reported
Substations named VERMONT AVE → LARRABEE; LEISURE VILLAGE; SOUTH LAKEWOOD; VERMONT AVE 2024-10-08 Not reported
In-service date 12/13/2030 → 02/10/2031 2026-05-14 2026-09-17
In-service date 12/31/2027 → 08/12/2027 2026-06-16 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 31
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection No role wording
34.5 kV
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 33
Customer Connection - Larrabee-Point Pleasant No. 2 34.5 kV R44 Line, NJ No role wording
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 15
JCPL Transmission Zone M-3 Process Larrabee No. 3 230-34.5 kV Transformer “Replace the 230-34.5 kV No. 3 transformer at Larrabee Substation.”
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 15
Automatic Restoration Projects “At Larrabee, replace relaying”
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 57
Vermont Ave 34.5 kV Customer Connection No role wording
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 59
Cookstown – Larrabee – Whitings 230 kV Line “At Larrabee Substation: – Replace line trap”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 72
Smithburg Substation No role wording
230 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 83
Automatic Restoration Projects No role wording
34.5 kV
2026-07-07 TEAC
Item 07 - JCPL Supplemental Projects p. 9
Lakewood, NJ “At Larrabee, establish a new 115 kV ring bus with one 115 kV breaker installed and expand the 230 kV yard with a new 230 kV string and two 230 kV breakers.”
230 kV
2026-06-16 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 8
Customer Connection - Larrabee-Point Pleasant No. 2 34.5 kV R44 Line, NJ No role wording
34.5 kV
2026-05-14 SRRTEP Mid-Atlantic
Item 05 - JCPL Supplemental Projects p. 5
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection No role wording
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 24
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations “Larrabee Substation - 230 kV equipment for direct connection”
230 kV
2026-01-06 TEAC
Item 03 - JCPL Supplemental Projects p. 3
Manchester 230-34.5 kV Substation No role wording
230 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32
Metedconk and Vermont Ave 34.5 kV Substations “Replace limiting conductor at Larrabee Substation”
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32
Metedconk and Vermont Ave 34.5 kV Substations “Replace limiting conductor at Larrabee Substation”
34.5 kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 15
JCPL Transmission Zone M-3 Process Larrabee No. 3 230-34.5 kV Transformer “Replace the 230-34.5 kV No. 3 transformer at Larrabee Substation.”
230-34.5 kV
2025-02-04 TEAC
Item 06 - JCPL Supplemental Projects p. 6
JCPL Transmission Zone M-3 Process Larrabee No. 3 230-34.5 kV Transformer “Replace the 230-34.5 kV No. 3 transformer at Larrabee Substation”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 15
Automatic Restoration Projects “At Larrabee, replace relaying”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 59
Cookstown – Larrabee – Whitings 230 kV Line “At Larrabee Substation: – Replace line trap, substation conductor and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.