Substation Scout

Parkersburg Substation

Named in 2 PJM planning documents for 2 projects, on October 8, 2024.

Existingdescribed as
APSzone
138 kVkV as printed
4mentions

Also printed as: Parkersburg · Parkersburg 138 kV Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Project
APS-2021-007
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2023-023 · s3100.1
Not printed $3.2 M 11/17/2023 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BELMONT; FRENCH CREEK; JOHNS JCT; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER → BELMONT; FRENCH CREEK; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER 2024-10-08 Not reported
Substations named PARKERSBURG; TRISSLER → GARRETT; GUILFORD; PARKERSBURG; REID; RIDGELEY; TRISSLER 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 41
Misoperation Relay Projects “At Parkersburg Substation, replace circuit breaker, wave trap, disconnect switch, substation conductor, & relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 79
Misoperation Relay Project “Parkersburg 138 kV Substation – Replace substation conductor”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 41
Misoperation Relay Projects “At Parkersburg Substation, replace circuit breaker, wave trap, disconnect switch, substation conductor, & relaying”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 76
Misoperation Relay Project “Parkersburg 138 kV Substation – Replace substation conductor”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this