East Rutherford
Named in 6 PJM planning documents for 4 projects, from October 8, 2024 to October 16, 2025.
Existingdescribed as
PSEGzone
138 kV, 138/26 kVkV as printed
6mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Bergen 138 kV series reactors b3869.1 |
Not printed | $12.5 M | 9/1/2027 | Not printed | 2024-11-14 SRRTEP Mid-Atlantic |
| Bergen 138 kV series reactors b3869.3 |
Not printed | $12.77M | 9/1/2027 | Not printed | 2025-10-16 SRRTEP Mid-Atlantic |
| East Rutherford Area PSEG-2023-0008 · s3010 |
Engineering | $32.5M | 06/2027 | Not printed | 2024-10-08 TEAC |
| East Rutherford Area PSEG-2024-0002 · s3604 |
Engineering | $43.1M | 5/31/2028 | Not printed | 2025-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate prior value printed on the same page |
$12.5 M → $12.77M | 2025-10-16 | 2025-10-16 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 2 |
East Rutherford Area | No role wording |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2025 RTEP p. 8 |
East Rutherford Area | “The East Rutherford 138/26 kV transformers No. 132-1 and 132-2 are exhibiting oil and nitrogen leaks” 138/26 kV |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 43 |
Bergen 138 kV series reactors | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
East Rutherford Area | “The East Rutherford 138/26 kV transformers No. 132-1 and
132-2 are exhibiting oil and nitrogen leaks” 138/26 kV |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 9 |
Bergen 138 kV series reactors | No role wording |
| 2024-10-08 | TEAC Informational Only - PSEG Local Plan submission of supplemental project 2024 p. 2 |
East Rutherford Area | No role wording |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.