Clubhouse
Named in 7 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
DOMzone
230/115/13.2 kVkV as printed
9mentions
Also printed as: Clubhouse substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Replace Clubhouse TX#1 - DEV DOM-2022-0024 · s3042 |
Under construction | $6.6 M | 05/15/2024 | Not printed | 2024-10-08 TEAC |
| Otterdam 230kV Delivery - MEC DOM-2023-0027 · s3067 |
Engineering | $25.0 M | 12/31/2026 | 100 MW | 2024-10-08 TEAC |
| Do No Harm Analysis DOM-2024-0023 - DNH · s3671 |
Conceptual | Lines 211 and 228: $33M Line 238: $112M | Q4 2030 | 300MW | 2025-10-08 TEAC |
| Dominion Transmission Zone: Supplemental Lewis Drive 115 kV Delivery - MEC DOM-2025-0029 · s4000 |
Under construction | $5.3M | 10/01/2026 | 25 MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ROGERS RD → BRODNAX; CLUBHOUSE; ROGERS RD | 2025-09-18 | 2026-07-17 |
| Substations named | BRODNAX; CLUBHOUSE; ROGERS RD → BRODNAX; CLUBHOUSE; LEWIS DRIVE; ROGERS RD | 2026-07-17 | 2026-07-17 |
| Substations named | BRODNAX; CLUBHOUSE; LEWIS DRIVE; ROGERS RD → BRODNAX; CLUBHOUSE; ROGERS RD | 2026-07-17 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 71 |
Dominion Transmission Zone: Supplemental Lewis Drive 115 kV Delivery - MEC | No role wording |
| 2026-09-08* | SRRTEP Southern Dominion p. 138 |
Otterdam 230kV Delivery - MEC | “Line #238 (Clubhouse - Carson)” |
| 2026-09-08* | SRRTEP Southern Dominion p. 32 |
Replace Clubhouse TX#1 - DEV | “Replace Clubhouse TX#1 with a new three-phase, 230/115/13.2 kV, 224 MVA unit.” 230/115/13.2 kV |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 01 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Lewis Drive 115 kV Delivery - MEC | No role wording |
| 2026-07-17 | SRRTEP Southern Item 01 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Lewis Drive 115 kV Delivery - MEC | No role wording |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 58 |
Do No Harm Analysis | No role wording |
| 2025-05-06 | TEAC Item 09 - DOM Supplemental Projects p. 10 |
Do No Harm Analysis | “to Clubhouse substation with new double circuit structures” |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 138 |
Otterdam 230kV Delivery - MEC | No role wording |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 32 |
Replace Clubhouse TX#1 - DEV | “Replace Clubhouse TX#1 with a new three-phase, 230/115/13.2 kV, 224 MVA unit” 230/115/13.2 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.