Corridor
Named in 5 PJM planning documents for 4 projects, from October 8, 2024 to January 7, 2025.
Existingdescribed as
AEPzone
138 kV, 345 kV, 345KVkV as printed
5mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Clusters AEP- 3, 4, 5 b3919.1 |
Not printed | $145.494 M | 12/31/2028 | 1.4GW | 2025-01-07 TEAC |
| Maliszewski 765/345 kV Upgrades | Not printed | 145.494 | Not printed | Not printed | 2024-11-19 TEAC |
| Central/NW OH, Indiana. AEP-2022-OH023, AEP-2022-OH034, AEP-2022-OH036, AEP-2022-OH045, AEP-2022-OH046, AEP-2022-OH075, AEP-2022-OH077, AEP-2023-OH016, AEP-2023-OH019, AEP-2023-OH032, AEP-2023-OH040, AEP-2023-OH044, AEP-2023-OH052, AEP-2023-OH063 · s3442.1-.30 |
Conceptual | $378.3M | 10/13/2027 | Not printed | 2024-10-08 TEAC |
| Clusters AEP- 3, 4, 5 2024-W1-408 |
Not printed | $145.494 | 12/31/2028 | 1115MW | 2024-12-03 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 154 |
Central/NW OH, Indiana. | “Corridor 138 kV: Replace (12) 63 kA circuit breakers & cap breakers” 138 kV |
| 2025-01-07 | TEAC Item 12 - Reliability Analysis Update p. 45 |
Clusters AEP- 3, 4, 5 | “Install three new 345 kV breakers at Corridor station” 345 kV |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 67 |
Clusters AEP- 3, 4, 5 | “Install three new 345 kV breakers at Corridor station” 345 kV |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Maliszewski 765/345 kV Upgrades | “Station work at Corridor 345 kV station” 345KV |
| 2024-10-08 | TEAC Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 154 |
Central/NW OH, Indiana. | “Replace (12) 63 kA circuit breakers & cap breakers with 80 kA circuit breakers” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.