Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-07-18 | SRRTEP Western Item 01 - Reliability Analysis Update p. 3 |
AEP Transmission Zone: Baseline
B3333 Reactivation and Scope Change B3333 |
Clell Clinch River Clinchfield Coal Creek Garden Creek Horn Mountain Knox Creek Marvin Mount Heron New Skeggs Branch Whetstone Branch Whitewood |
Cost $106.589M In service 12/10/2027 |
| 2025-07-18 | SRRTEP Western Item 02 - APS Supplemental Projects p. 3 |
Misoperation Relay Projects APS-2024-014 |
Millville Sleepy Hollow |
Status Conceptual |
| 2025-07-18 | SRRTEP Western Item 02 - APS Supplemental Projects p. 3 |
Misoperation Relay Projects APS-2024-047 |
Cherry Run Morgan |
Status Conceptual |
| 2025-07-18 | SRRTEP Western Item 02 - APS Supplemental Projects p. 3 |
Misoperation Relay Projects APS-2025-018 |
Black Oak Cross School |
Status Conceptual |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 3 |
Niles Substation ATSI-2025-019 |
Niles Substation | Load 300 MVA |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 4 |
Firestone Substation ATSI-2025-021 |
Firestone South Akron Urban Substation |
Load 7 MVA |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 6 |
Crossland – Sharon 138 kV Z-112 Line Customer Connection ATSI-2025-013 |
Crossland Sharon |
Status Conceptual Cost $0.9M In service 6/11/2027 Load 80 MVA |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 8 |
Homer – Wellington 69 kV Line Customer Connection ATSI-2025-014 |
Homer Wellington |
Status Conceptual Cost $0.9M In service 3/15/2026 Load 6.5 MVA |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 11 |
Star-Seville (Rittman) 69 kV Line – s1802 Scope Change s1802 |
Acme Hill Substation Rittman Seville Substation Star |
Status Engineering Cost $36.5 M In service 12/31/2027 |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 3 |
AEP Transmission Zone: Supplemental
S2167 Scope Change AEP-2018-IM002, AEP-2019-IM035, AEP-2019-IM025, AEP-2019-IM046 · S2167 |
Boundary station New FourFlag station New Kenzie Creek Lake Street station Niles station Pokagon station South Side Station Swanson station |
Status Scoping (Conceptual) Cost $125.8M In service 3/13/2026 |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 6 |
Windsor, OH AEP-2025-OH004 |
None named | Load 20 MW |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 7 |
South Canton, OH/Torrey, OH AEP-2025-OH007 |
None named | Load 255 MW |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 8 |
Forest3, OH/Upper Sandusky, OH AEP-2025-OH009 |
None named | Load 13.5MW |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 9 |
Pickaway County, OH AEP-2025-OH010 |
None named | Load 12.1MW |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 10 |
East Leipsic, OH AEP-2025-OH011 |
East Leipsic | No figures printed |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 11 |
Hannibal, WV AEP-2025-OH012 |
Hannibal | Load 570 MW |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 12 |
Cleveland, IN AEP-2025-IM006 |
Cleveland | No figures printed |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 14 |
Dowagiac, MI AEP-2024-IM011 |
None named | Status Engineering Cost $3.719 M In service 12/01/2025 |
| 2025-07-18 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 16 |
Jefferson County, Ohio AEP-2022-OH017 |
Ft Steuben Hammondsville |
Status Scoping (Conceptual) Cost $84.162 M In service 03/16/2029 |
| 2025-07-17 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental
Muncy, PA PPL-2019-0006 |
Lycoming Muncy |
No figures printed |
| 2025-07-17 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 5 |
PPL Transmission Zone: Supplemental
Mount Carmel, PA PPL-2025-0011 |
Cleveland Eldred |
Status Conceptual Cost $0.9 M In service 12/10/2026 |
| 2025-07-08 | TEAC Item 03 - ATSI Supplemental Projects p. 3 |
Niles – Shenango 345 kV Line ATSI-2024-006 |
Niles Substation Shenango |
Status Conceptual Cost $73.92M In service 12/17/2027 |
| 2025-07-08 | TEAC Item 03 - ATSI Supplemental Projects p. 5 |
Beaver Valley – Hanna 345 kV Line and Hanna – Mansfield 345 kV Line ATSI-2024-013 |
Beaver Valley Hanna Mansfield |
Status Conceptual Cost $53.35M In service 5/31/2028 |
| 2025-07-08 | TEAC Item 03 - ATSI Supplemental Projects p. 7 |
Bayshore – Davis Besse 345 kV Line ATSI-2024-019 |
Bayshore Davis Besse |
Status Conceptual Cost $21.12M In service 05/28/2027 |
| 2025-07-08 | TEAC Item 03 - ATSI Supplemental Projects p. 9 |
Sammis – Star 345 kV Line ATSI-2024-027 |
Sammis Star |
Status Conceptual Cost $343.70M In service 5/30/2031 |
| 2025-07-08 | TEAC Item 04 - AEP Supplemental Projects p. 3 |
Desoto, IN/Aladdin, IN/Fall Creek, IN AEP-2024-IM013 |
Aladdin station Desoto Fall Creek |
Status Scoping (Conceptual) Cost $9.326 M In service 05/27/2026 |
| 2025-07-08 | TEAC Item 05 - Dayton Supplemental Projects p. 3 |
Dayton-2025-003 | Darby Substation | In service 7/2028 Load 135 MW |
| 2025-07-08 | TEAC Item 05 - Dayton Supplemental Projects p. 4 |
Dayton-2025-004 | Hutchings | In service 6/2027 Load 180 MW |
| 2025-07-08 | TEAC Item 05 - Dayton Supplemental Projects p. 5 |
Dayton-2025-005 | Sidney | In service 6/2029 Load 400 MW |
| 2025-07-08 | TEAC Item 05 - Dayton Supplemental Projects p. 6 |
Dayton-2025-006 | Urbana Substation | In service 6/2030 Load 300 MW |
| 2025-07-08 | TEAC Item 05 - Dayton Supplemental Projects p. 7 |
Dayton-2025-007 | Eldean | In service 12/2030 Load 600 MW |
| 2025-07-08 | TEAC Item 06 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone M-3 Process
Pocono Area PPL-2025-0012 |
None named | In service 05/2027 Load 1,500 MW |
| 2025-07-08 | TEAC Item 07 - PECO Supplemental Projects p. 3 |
PE-2025-002 | Jenkintown Whitemarsh Whitpain |
No figures printed |
| 2025-07-08 | TEAC Item 08 - DEOK Supplemental Projects p. 3 |
Customer Load Request DEOK-2025-003 |
Beckett Cotton Run New Miami Fort Millikin Port Union Todhunter Wayne-Madison New West Milton Woodsdale |
Load 800 MW |
| 2025-07-08 | TEAC Item 09 - PSEG Supplemental Projects p. 3 |
Newark Area PSEG-2025-0002 |
McCarter Switching station Newark switching station |
Status Conceptual Cost $27.2M In service 12/2029 |
| 2025-07-08 | TEAC Item 10 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental
Lines #92, #287, and #2129 EOL Rebuild DOM-2025-0026 |
Chesterfield Lanexa Providence Forge Turner |
Status Engineering Cost $54M In service 12/31/2028 |
| 2025-07-08 | TEAC Item 11 - Reliability Analysis Update p. 15 |
Cancellation of b2436.90 b2436.90 |
Farragut Hudson Marion |
Status Cancellation (Cancelled) Cost $38.25M |
| 2025-07-08 | TEAC Item 11 - Reliability Analysis Update p. 16 |
Cancellation of b3737.52 b3737.52 |
Conastone | Status Cancellation (Cancelled) Cost $1.3M |
| 2025-07-08 | TEAC Item 11 - Reliability Analysis Update p. 18 |
2022 W3 Chanceford-Doubs Project Update b3800.1, b3800.3, b3800.53 |
Chanceford New Conastone Doubs Otter Creek New Peach Bottom TMI |
Cost $148.15 M In service 6/1/2027 |
| 2025-07-08 | TEAC Item 11 - Reliability Analysis Update p. 23 |
DVP/AEP/PSEG Transmission Zone: Baseline b3936, b3937, b3938, b3929 |
None named | Cost $3.35M In service 6/1/2029 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.