Sabrooke

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to April 15, 2026.

Existingdescribed as
COMEDzone
138 kV, 138kVkV as printed
3mentions

PJM interconnection queue

A PJM queue substation page has the same name: Sabrooke (IL) — 2 queue requests filed, 1 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
South Pecatonica
ComEd-2024-012 · s3348
Conceptual $38.5M 12/31/26 13 MW 2024-10-08
TEAC
Sabrooke 138KV CBs
ComEd-2026-003
Conceptual $3.75M 12/31/2027 Not printed 2026-04-15
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2024 RTEP p. 27
South Pecatonica No role wording
138 kV
2026-04-15 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 5
Sabrooke 138KV CBs “Sabrooke 138kV oil circuit breakers L17113 and BT1-3 were installed in 1969 and 1976 respectively.”
138kV
2024-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2024 p. 27
South Pecatonica No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.