Mickleton

Named in 3 PJM planning documents for 3 projects, from November 6, 2024 to December 3, 2024.

Existingdescribed as
ACEzone
230/69 kVkV as printed
3mentions

Also printed as: Mickleton Substation

PJM interconnection queue

A PJM queue substation page has the same name: Mickleton (NJ) — 12 queue requests filed, 4 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Delco Tap – Mickleton Facility Upgrades
b3867.1
Not printed $1.03M 06/01/2029 Not printed 2024-12-03
TEAC
Delco Tap – Mickleton Facility Upgrades Not printed $1.03M 06/01/2029 Not printed 2024-11-06
TEAC
Mickleton 230/69 kV T1 Replacement
ACE-2023-001 · s3180.1
Engineering $5.9 M 05/31/25 Not printed 2026-09-08*
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
ACE local plan submission for 2024 RTEP p. 8
Mickleton 230/69 kV T1 Replacement “At Mickleton Substation, replace the existing transformer”
230/69 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 39
Delco Tap – Mickleton Facility Upgrades “Upgrade a circuit switcher at the Mickleton (Mickleton – Delco Tap line) Substation”
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 39
Delco Tap – Mickleton Facility Upgrades “Upgrade a circuit switcher at the Mickleton Substation”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.