Substation Scout

Elmont

Named in 17 PJM planning documents for 14 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
230 kV, 230kV, 500/230 kV, 500kVkV as printed
23mentions

PJM interconnection queue

A PJM queue substation page has the same name: Elmont (VA) — 3 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer
b3213
Not printed $34.03M 6/1/2023 Not printed 2026-04-07
TEAC
Dominion Transmission Zone: Baseline 500kV Line #557 Elmont-Chickahominy
b3692
Not printed $185.16 M 6/30/2028 Not printed 2025-05-06
TEAC
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation
B4000.355 – B4000.359
Not printed $1,109.89M 6/1/2029 Not printed 2026-05-08
TEAC
Regional Solution: 2025-W1-275 Portfolio
b4053.1
Not printed $4832.45 6/1/2032 Not printed 2026-01-06
TEAC
Thornburg 500/230kV Substation (Bypass Elmont & Possum Point 500kV)
b4053.34
Not printed $1M 6/1/2032 Not printed 2026-10-06
TEAC
Pearsons Switch Replacement
DOM-2022-0060 · s3060
Not printed $0.5 M 10/31/2023 Not printed 2024-10-08
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2023-0016 · s3731
Engineering $27 M 05/31/2025 248.0 MW 2026-10-06
TEAC
Do No Harm Analysis
DOM-2023-0023 - DNH · s3990.2
Conceptual $17.5M 12/31/2031 Not printed 2026-10-06
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2024-0018 · s3673
Engineering $20M Substation, $5M Transmission Line Q4 2027 255.0 MW 2025-10-08
TEAC
Stockholm 230kV Delivery - DEV
DOM-2024-0049 · s3995
Conceptual $ 26M Q4 2028 300 MW 2026-10-06
TEAC
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency
DOM-2024-0051 · s3999
Engineering $185M 12/31/2030 Not printed 2026-10-06
TEAC
Flamingo 230kV Delivery - DEV
DOM-2024-0058
Cancelled $10M 12/31/2029 47.0 MW 2026-09-08
TEAC
Install 230 kV Conductor on North Anna to Bristers Structures
DOM-2026-0022
Engineering $33.75 M Q4 2030 3000 MW 2026-06-02
TEAC
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio
2025-W1-275
Not printed Not printed 6/1/2032 Not printed 2025-12-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$31.05M → $34.03M 2026-04-07 2026-04-07
Cost estimate
prior value printed on the same page
$58.155 M → $185.16 M 2025-05-06 2025-05-06
Cost estimate
prior value printed on the same page
$1,055.3 M → $1,109.89M 2025-01-07 2025-01-07
Cost estimate
prior value printed on the same page
$1,109.89M → $978.76 M 2026-08-04 2026-08-04
Cost estimate $1,109.89M → $978.76 M 2026-05-08 2026-08-04
Substations named BRISTERS; ELK RUN; JOSHUA FALLS; MEADOWBROOK; VINT HILL; YEAT → BRISTERS; CULPEPER YEAT; CUNNINGHAM; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MIDLOTHIAN; MORRISVILLE; MOSBY; NOKESVILLE; NORTH ANNA; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT 2025-01-07 2026-04-07
Substations named BRISTERS; CULPEPER YEAT; CUNNINGHAM; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MIDLOTHIAN; MORRISVILLE; MOSBY; NOKESVILLE; NORTH ANNA; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT → ANDERSON BRANCH; BRISTERS; CULPEPER YEAT; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MORRISVILLE; MOSBY; NOKESVILLE; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT 2026-04-07 2026-05-08
Substations named ANDERSON BRANCH; BRISTERS; CULPEPER YEAT; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MORRISVILLE; MOSBY; NOKESVILLE; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT → BRISTERS; CLOVERDALE; ELK RUN; JOSHUA FALLS; MEADOWBROOK; VINT HILL; YEAT 2026-05-08 2026-08-04
Cost estimate $27.0 M → $450.0M 2025-04-01 2026-06-02
Cost estimate $450.0M → $27 M 2026-06-02 2026-10-06
In-service date 05/31/2025 → 07/01/2029 2025-04-01 2026-06-02
In-service date 07/01/2029 → 05/31/2025 2026-06-02 2026-10-06
Substations named ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; RUTHER GLEN; ST JOHNS → ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2025-04-01 2026-06-02
Substations named ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG → ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2026-06-02 2026-10-06
In-service date Q4 2027 → 12/01/2030 2025-01-07 2025-05-06
In-service date 12/01/2030 → Q4 2027 2025-05-06 2025-10-08
Status engineering (Engineering) → conceptual (Conceptual) 2025-01-07 2025-05-06
Status conceptual (Conceptual) → engineering (Engineering) 2025-05-06 2025-10-08
Substations named CHICKAHOMINY; ELMONT; THICKET; WHITE OAK → BERMUDA HUNDRED; CHICKAHOMINY; DARBYTOWN; ELKO; ELMONT; TECHPARK PLACE; THICKET; WHITE OAK 2025-01-07 2025-05-06
Substations named STOCKHOLM; THICKET → CHICKAHOMINY; ELMONT; STOCKHOLM; THICKET; WHITE OAK 2026-05-08 2026-10-06
Cost estimate
prior value printed on the same page
$108M → $165M 2026-06-02 2026-06-02
Cost estimate Transmission: $108M; Substation: $15M → $165M 2025-06-05 2026-06-02
Cost estimate $165M → $185M 2026-06-02 2026-10-06
Status conceptual (Conceptual) → engineering (Engineering) 2025-06-05 2026-06-02
Cost estimate $20.0M Substation, $10M Transmission Lines → $10M 2025-10-08 2026-09-08
Status engineering (Engineering) → cancelled (Canceled) 2025-10-08 2026-09-08
Substations named FLAMINGO → ELMONT; FLAMINGO; SHORT PUMP 2025-10-08 2026-09-08
Substations named BRISTERS; ELMONT; FREDERICKSBURG; NORTH ANNA; THORNBURG → BRISTERS; NORTH ANNA; THORNBURG 2026-06-02 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 102
Do No Harm Analysis “Replace Elmont 500/230 kV TX #2 with new 1440 MVA TX”
500/230 kV
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 51
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 60
Stockholm 230kV Delivery - DEV No role wording
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 69
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 9
Thornburg 500/230kV Substation (Bypass Elmont & Possum Point 500kV) No role wording
2026-09-08 TEAC
Item 10 - DOM Supplemental Projects p. 12
Flamingo 230kV Delivery - DEV No role wording
230kV
2026-09-08* SRRTEP Southern
Dominion p. 104
Pearsons Switch Replacement No role wording
2026-07-07 TEAC
Item 14 - DOM Supplemental Projects p. 7
Do No Harm Analysis “Replace Elmont 500/230 kV TX #2”
500/230 kV
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 12
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 7
Install 230 kV Conductor on North Anna to Bristers Structures No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
230 kV
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 18
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation No role wording
2026-04-07 TEAC
Item 11 - Reliability Analysis Update p. 14
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation No role wording
500kV
2026-04-07 TEAC
Item 11 - Reliability Analysis Update p. 18
Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer No role wording
500kV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 36
Regional Solution: 2025-W1-275 Portfolio “Construct one (1) new 500kV line terminal position at the existing Elmont substation.”
500kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 82
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio “Construct one (1) new 500kV line terminal position at the existing Elmont substation.”
500kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 57
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2025-06-05 TEAC
Item 08 - DOM Supplemental Projects p. 10
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
2025-05-06 TEAC
Item 09 - DOM Supplemental Projects p. 8
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2025-05-06 TEAC
Item 10 - Reliability Analysis Update p. 8
Dominion Transmission Zone: Baseline 500kV Line #557 Elmont-Chickahominy No role wording
2025-04-01 TEAC
Item 11 - DOM Supplemental Projects p. 16
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2025-01-07 TEAC
Item 10 - Dominion Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 104
Pearsons Switch Replacement No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this