Substation Scout

Blaire

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
AEPzone
69 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Columbus, OH
AEP-2023-OH047 · s3213.1-.6
Engineering $12.05 M 04/15/2024 33.5 MVA 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 73
Columbus, OH “Upgrade Sub Cond 477 AAC 19 Str. at Blaire 69 kV”
69 kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 73
Columbus, OH “Upgrade Sub Cond 477 AAC 19 Str. at Blaire 69 kV”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.