Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
ATSIzone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in ATSI Transmission Zone M3 Process Pioneer, OH
AMPT-2022-002
Not printed $12.6 M 5/31/2027 8 MW 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $26.5 M → $12.6 M Not reported Not reported
Cost estimate $12.6 M → $26.5 M 2024-10-08 Not reported
Cost estimate $26.5 M → $12.6 M 2024-10-08 2024-10-08
Substations named EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER → E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER Not reported Not reported
Substations named E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER → EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER 2024-10-08 Not reported
Substations named EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER → E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER 2024-10-08 2024-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 39
AMPT Projects in ATSI Transmission Zone M3 Process Pioneer, OH “Revise relay settings at E Fayette and Snyder substations”
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 39
AMPT Projects in ATSI Transmission Zone M3 Process Pioneer, OH “Revise relay settings at E Fayette and Snyder substations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.