Substation Scout

Liberty

Named in 6 PJM planning documents for 7 projects, from October 8, 2024 to September 8, 2026.

Existingdescribed as
DOMzone
230 kVkV as printed
13mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dawkins Branch 230kV Delivery - NOVEC
DOM-2022-0017 · s3018
Not printed $16.0M 06/30/2023 76.8 MW 2024-10-08
TEAC
Hornbaker 230kV Delivery - NOVEC
DOM-2022-0045 · s3035.1
Engineering $45.0M 12/30/2025 150.0 MW 2024-10-08
TEAC
Do No Harm (DNH) Analysis
DOM-2022-0046-DNH & DOM-2022-0047-DNH
Conceptual $114.0M 12/31/2027 Not printed 2024-10-08
TEAC
Rixlew 230kV Delivery - NOVEC
DOM-2022-0047 · s3037
Engineering $10.0M 06/20/2025 100 MW 2024-10-08
TEAC
Do No Harm Analysis
DOM-2023-0013-DNH
Conceptual $88.0M 06/15/2029 300 MW 2024-12-03
TEAC
Pegasus 230kV Delivery – NOVEC
DOM-2024-0047 · s3700
Engineering $28.5M 04/14/2027 87.0 MW 2025-10-08
TEAC
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk
DOM-2026-0016
Conceptual Not printed Not printed Not printed 2026-09-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $37.5M → $23.0M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$115.0M → $114.0M 2024-10-08 2024-10-08
Cost estimate $114.0M → $37.5M 2024-10-08 2026-10-06
Cost estimate
prior value printed on the same page
$23 → $37.5M 2026-10-06 2026-10-06
Substations named ANDERSON BRANCH; BRISTERS; NOKESVILLE → BRISTERS; LIBERTY; LOUDOUN; MEADOWBROOK; MORRISVILLE; NOKESVILLE; REMINGTON CT; ROLLINS FORD; VINT HILL; WHEELER; WISHING STAR 2026-10-06 Not reported
Substations named BRISTERS; LIBERTY; LOUDOUN; MEADOWBROOK; MORRISVILLE; NOKESVILLE; REMINGTON CT; ROLLINS FORD; VINT HILL; WHEELER; WISHING STAR → ANDERSON BRANCH; BRISTERS; NOKESVILLE 2024-10-08 2026-10-06
Substations named DAWKINS BRANCH; DEVLIN; GAINESVILLE; LIBERTY; PEGASUS; RAILROAD; ROLLINS FORD; VINT HILL → DAWKINS BRANCH; DEVLIN; PEGASUS 2024-12-03 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08 TEAC
Item 10 - DOM Supplemental Projects p. 6
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk “Replace the 230 kV cap banks at Liberty, Clifton, Greenwich, Lanexa, Pleasant View, Jefferson Street, Valley and Newport News”
230 kV
2026-09-08* SRRTEP Southern
Dominion p. 25
Dawkins Branch 230kV Delivery - NOVEC No role wording
2026-09-08* SRRTEP Southern
Dominion p. 59
Hornbaker 230kV Delivery - NOVEC No role wording
2026-09-08* SRRTEP Southern
Dominion p. 65
Rixlew 230kV Delivery - NOVEC No role wording
2026-09-08* SRRTEP Southern
Dominion p. 84
Do No Harm (DNH) Analysis No role wording
2026-04-07 TEAC
Item 09 - DOM Supplemental Projects p. 5
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk “cap banks needing replacement between 2027 and 2028 are located at Pleasant View, Greenwich, Liberty”
230 kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 13
Pegasus 230kV Delivery – NOVEC No role wording
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 11
Pegasus 230kV Delivery – NOVEC No role wording
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 8
Do No Harm Analysis No role wording
230 kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 25
Dawkins Branch 230kV Delivery - NOVEC No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 59
Hornbaker 230kV Delivery - NOVEC No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 65
Rixlew 230kV Delivery - NOVEC No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 84
Do No Harm (DNH) Analysis No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.