Substation Scout

Hutching

Named in 3 PJM planning documents for 1 project, from February 13, 2026 to October 6, 2026.

Existingdescribed as
DAYTONzone
—kV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton Transmission Zone M-3 Process
Dayton-2021-003 · s3846.1 – .4
Conceptual $6.2M 12/1/2028 33MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named CAMDEN; CRYSTAL; GERMANTOWN; GRATIS; HUTCHING; HUTCHINGS → CAMDEN; CRYSTAL; GERMANTOWN; GRATIS; HUTCHING 2026-02-13 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dayton Local Plan Submission of the supplemental projects for 2026 p. 3
Dayton Transmission Zone M-3 Process “AES will refurbish the protection and controls at Crystal and Hutching substations”
2026-09-30* SRRTEP Western
Datyon local plan submission of the supplemental projects for 2026 RTEP p. 3
Dayton Transmission Zone M-3 Process “refurbish the protection and controls at Crystal and Hutching substations”
2026-02-13 SRRTEP Western
Item 06 - Dayton Supplemental Projects p. 9
Dayton Transmission Zone M-3 Process “refurbish the protection and controls at Crystal and Hutching substations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this