Substation Scout

Des Plaines

Named in 12 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
COMEDzone
138 kV, 345 kV, 345/138 kV, 345KV/138KV, 345kVkV as printed
13mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Elk Grove
ComEd-2023-008 · s3582.1, s3582.2
Engineering $158M 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) 378 MW 2025-10-08
TEAC
Des Plaines 345/138 kV Transformer 83
ComEd-2023-011 · s3157
Engineering $24.1M 12/31/25 Not printed 2024-10-08
TEAC
Cluster 2
ComEd-2024-004
Not printed $14.31 M 6/1/2029 Not printed 2024-12-03
TEAC
Des Plaines 345 kV CBs
ComEd-2025-026
Conceptual $3.9M 12/31/2027 Not printed 2025-12-08
TEAC
Des Plaines 345KV/138KV TR 34KV Tertiary Caps
ComEd-2026-010
Engineering $ 10.91M 12/31/2027 (Phase 1), 12/31/28 (Phase 2) Not printed 2026-07-17
SRRTEP Western
MISO Tranche 2.1 Request
ComEd 2024-023 · s3843
Conceptual $908.7M 6/1/2034 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DES PLAINES; ELK GROVE; LOMBARD; ROLLING MEADOWS; SCHAUMBURG → DES PLAINES; ELK GROVE; LOMBARD; SCHAUMBURG 2025-10-08 Not reported
Cost estimate $14.31 M → $40.6M 2024-12-03 2025-10-08
In-service date 6/1/2029 → 12/31/2026 (s3583.1), 12/31/2027 (s3583.2) 2024-12-03 2025-10-08
Substations named BUSSE; DES PLAINES; ITASCA → ELK GROVE EAST; ITASCA 2024-12-03 2025-10-08
Substations named DES PLAINES → DES PLAINES; ITASCA 2025-11-04 2025-12-08
Substations named DES PLAINES → BUSSE; DES PLAINES; GOLF MILL 2026-06-17 2026-07-17
Cost estimate
prior value printed on the same page
$874.2M → $908.7M 2025-11-04 2025-11-04
Cost estimate $874.2M* → $908.7M 2025-03-04 2025-11-04
Substations named BABCOCK; COLLINS; GREEN ACRES; KATYDID; LAKEVIEW; NEVADA; OLIVE; PARIS; PLEASANT PRAIRIE; POWERTON; UNIVERSITY PARK; WOODFORD COUNTY; ZION → BABCOCK; COLLINS; DES PLAINES; GREEN ACRES; KATYDID; LAKEVIEW; NEVADA; OLIVE; PARIS; PLEASANT PRAIRIE; POWERTON; UNIVERSITY PARK; WOODFORD COUNTY; ZION 2025-03-04 2025-11-04

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 7
MISO Tranche 2.1 Request “Replace 345 kV BT 1-5, BT 2-5, BT 2-3, L4620, L4621, and L12006 oil CBs at Des Plaines”
345 kV
2026-09-30* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2026 RTEP p. 7
MISO Tranche 2.1 Request “Replace 345 kV BT 1-5, BT 2-5, BT 2-3, L4620, L4621, and L12006 oil CBs at Des Plaines”
345 kV
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 12
Customer in Elk Grove No role wording
345kV
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2024 RTEP p. 10
Des Plaines 345/138 kV Transformer 83 “Des Plaines 345/138 kV Transformer 83”
345/138 kV
2026-07-17 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 4
Des Plaines 345KV/138KV TR 34KV Tertiary Caps “Remove the 34KV 108MVAR Tertiary Capacitor Banks on Des Plaines”
345KV/138KV
2026-06-17 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 3
Des Plaines 345KV/138KV TR 34KV Tertiary Caps “Des Plaines autotransformer 345KV/138KV TR84”
345KV/138KV
2025-12-08 TEAC
Item 09 - ComEd Supplemental Projects p. 7
Des Plaines 345 kV CBs “Des Plaines 345 kV oil circuit breakers L10111 & L10112 were installed in 1966 and 1977, respectively”
345 kV
2025-11-04 TEAC
Item 11 - ComEd Supplemental Projects p. 10
MISO Tranche 2.1 Request “Replace 345 kV BT 1-5, BT 2-5, BT 2-3, L4620, L4621, and L12006 oil CBs at Des Plaines”
345 kV
2025-11-04 TEAC
Item 11 - ComEd Supplemental Projects p. 5
Des Plaines 345 kV CBs “Des Plaines 345 kV BT oil circuit breakers L10111 & L10112 were installed in 1966 and 1977, respectively.”
345 kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 12
Customer in Elk Grove No role wording
345kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 55
Cluster 2 No role wording
138 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 36
Cluster 2 No role wording
138 kV
2024-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2024 p. 10
Des Plaines 345/138 kV Transformer 83 “Replace 345/138 kV autotransformer with a new standard autotransformer”
345/138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this