Essex Switch

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
PSEGzone
—kV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Essex (NJ) — 20 queue requests filed, 6 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Newark Bay Cogen
PSEG-2023-0010 · s3277.1
Engineering $2M October 2024 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ESSEX; NEWARK BAY COGEN → ESSEX 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2024 RTEP p. 17
Newark Bay Cogen “Retire the Essex Switch to Newark Bay Cogen circuit (J-2210) assets”
2024-10-08 TEAC
Informational Only - PSEG Local Plan submission of supplemental project 2024 p. 17
Newark Bay Cogen “Retire the Essex Switch to Newark Bay Cogen circuit (J-2210) assets”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.