South Akron
Named in 6 PJM planning documents for 5 projects, from July 18, 2025 to March 19, 2026.
Existingdescribed as
ATSIzone
138 kV, 23 kVkV as printed
7mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Glenmount 138 kV Substation ATSI-2023-009 · s3546.1 |
Not printed | $23.54 M | 12/31/2027 | 55 MW | 2025-10-08 TEAC |
| Tusc Substation ATSI-2023-011 |
Conceptual | $16.72M | 12/31/2027 | Not printed | 2025-09-19 SRRTEP Western |
| Akron/Summit County Area ATSI-2023-024 |
Conceptual | $36.49M | 06/01/2029 | Not printed | 2026-03-19 SRRTEP Western |
| Firestone Substation ATSI-2025-021 |
Conceptual | $0.3M | 2/16/2026 | Not printed | 2025-09-19 SRRTEP Western |
| Dale 138 kV Substation ATSI-2026-004 |
Not printed | Not printed | Not printed | 56 MW | 2026-01-16 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | FIRESTONE; PINE; SOUTH AKRON; STAR; TUSC; URBAN; WADSWORTH; WEST AKRON → TUSC | 2025-09-19 | 2026-10-06 |
| Substations named | CLAYBEN; GILCHRIST; LAKEMORE; MCKNIGHTS; NORTH CLAYBEN; ROCHLING AUTO; SOUTH AKRON; STAR → CLAYBEN; LAKEMORE; MCKNIGHTS; NORTH CLAYBEN | 2026-03-19 | 2026-10-06 |
| Substations named | FIRESTONE; SOUTH AKRON; URBAN → FIRESTONE; URBAN | 2025-09-19 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 12 |
Glenmount 138 kV Substation | “Modify South Akron substation” 138 kV |
| 2026-03-19 | SRRTEP Western Item 02 - ATSI Supplemental Project p. 15 |
Akron/Summit County Area | No role wording 138 kV |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 6 |
Dale 138 kV Substation | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Glenmount 138 kV Substation | “Modify South Akron substation” 23 kV |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 7 |
Tusc Substation | No role wording 138 kV |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 9 |
Firestone Substation | No role wording 138 kV |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 4 |
Firestone Substation | No role wording 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.