Named in 2 PJM planning documents for 2 projects, on October 8, 2024.

Existingdescribed as
PENELECzone
230 kV, 345/230-20 kVkV as printed
3mentions

Also printed as: Homer City Substation

PJM interconnection queue

A PJM queue substation page has the same name: Homer City (PA) — 4 queue requests filed, 2 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Johnstown 230 kV Substation
PN-2023-004 · s3396.1
Not printed $1.12M 12/30/2023 Not printed 2024-10-08
TEAC
Homer City South 345-230 kV Transformer
PN-2024-007 · s3335.1
Not printed $8.8M 06/01/2027 Not printed 2026-09-08*
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 22
Homer City South 345-230 kV Transformer “Replace Homer City South 345/230-23 kV Transformer”
345/230-20 kV
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 27
Johnstown 230 kV Substation “At Homer City Substation, replace the following:”
230 kV
2024-10-08 TEAC
Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 27
Johnstown 230 kV Substation “At Homer City Substation, replace the following”
230 kV