Named in 4 PJM planning documents for 3 projects, from October 8, 2025 to November 14, 2025.

Existingdescribed as
COMEDzone
138 kV, 345 kV, 345/138 kVkV as printed
4mentions

Also printed as: Elk Grove substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Elk Grove 345/138 kV Transformer
b3981.1
Not printed $28.96 M 6/1/2030 Not printed 2025-11-14
SRRTEP Western
Elk Grove 345/138 kV Transformer Not printed $28.96 M 6/1/2030 Not printed 2025-10-17
SRRTEP Western
Customer in Elk Grove
ComEd-2023-008 · s3582.1, s3582.2
Engineering $158M 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) 378 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DES PLAINES; ELK GROVE; LOMBARD; ROLLING MEADOWS; SCHAUMBURG → DES PLAINES; ELK GROVE; LOMBARD; SCHAUMBURG 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 11
Customer in Elk Grove “Install 2 new 420 MVA 345/138 kV autotransformers at Elk Grove”
345 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 25
Elk Grove 345/138 kV Transformer “Install a 345/138 kV transformer TR 83 and associated equipment at Elk Grove substation”
345/138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 19
Elk Grove 345/138 kV Transformer “associated equipment at Elk Grove substation”
345/138 kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 11
Customer in Elk Grove “each 138 kV line from Elk Grove to new customer site”
138 kV