Mentions: July 2026
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2026-07-17 | SRRTEP Mid-Atlantic Item 01 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental Lewis Drive 115 kV Delivery - MEC DOM-2025-0029 |
Brodnax Clubhouse Rogers Rd Sub |
Status Construction (Under construction) Cost $5.3M In service 10/01/2026 Load 25 MW |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 3 |
Morris Park Substation - 34.5 kV Breakers, NJ JCPL-2026-038 |
Captive Place Tap Marble Hill Morris Park Philipsburg Rand Blvd Warren Glen SWPT |
No figures printed |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 6 |
Bernardsville - Gillette 34.5 kV B730 Line, NJ JCPL-2024-011 |
Bernardsville Gillette Lyons Martinsville Stirling Substation Stirling Tap |
Status Conceptual Cost $20.51M In service 06/30/2028 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 9 |
EH Werner - Keyport 34.5 kV V48 Line Rebuild, NJ JCPL-2024-038 |
Clifford Solar Substation EH Werner Keyport |
Status Conceptual Cost $42.10M In service 04/05/2030 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 11 |
Manitou 34.5 kV Submarine Cables, NJ JCPL-2025-012 |
Island Heights Tap Manitou Ocean Beach Ortley Beach Seaside Park Seaside Park 1 Tap Toms River Tap |
Status Conceptual Cost $10.00M In service 04/23/2029 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 3 |
Hill - Jackson 115 kV 969 Line - New Customer Connection, PA ME-2026-006 |
Hill Jackson |
Status Conceptual Cost $1.81M In service 04/01/2028 Load approximately 22 MW |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 04 - Penelec Supplemental Projects p. 3 |
Dubois – Harvey Run – Whetstone 115 kV Line Rehab, PA PN-2018-001 · S1769 |
Dubois Harvey Run Whetstone |
Status Conceptual Cost $39.3M In service 6/29/2030 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 04 - Penelec Supplemental Projects p. 7 |
Reeds Gap Switching Station – Blain115 kV Line Rebuild, PA PN-2020-013 |
Blain Substation Reeds Gap Substation Shade Gap Substation |
Status Conceptual Cost $36.80M In service 12/15/2029 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 05 - ACE Supplemental Projects p. 3 |
Court 69kV Substation ACE-2026-003 |
Court | No figures printed |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 06 - BGE Supplemental Projects p. 3 |
Dorsey Run 110-3 BGE-2026-002 |
Dorsey Run | Status Engineering Cost $0M In service 10/31/2026 Load 20 MW |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 06 - BGE Supplemental Projects p. 5 |
Perryman to Edgewood Rebuild BGE-2026-003 |
Edgewood Perryman |
Status Engineering Cost $36.27M In service 12/31/2028 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 06 - BGE Supplemental Projects p. 7 |
Granite to Chestnut Hill Rebuild BGE-2026-004 |
Chestnut Hill Granite |
Status Engineering Cost $13.4M In service 12/31/2027 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 06 - BGE Supplemental Projects p. 9 |
Granite 230-1 BGE-2026-005 |
Granite | Status Engineering Cost $13.1M In service 12/31/2026 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 07 - DPL Supplemental Projects p. 3 |
DPL-2026-002 | Carrcroft | No figures printed |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 07 - DPL Supplemental Projects p. 4 |
DPL-2026-003 | Oak Hall Tasley |
No figures printed |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 08 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental
Varden 69kV Tap PPL-2026-0038 |
Varden | In service 1/30/2030 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 08 - PPL Supplemental Projects p. 4 |
PPL Transmission Zone: Supplemental
Arrowhead 69kV Tap PPL-2026-0039 |
Arrowhead | In service 11/30/2029 |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 09 - PSEG Supplemental Projects p. 3 |
Cherry Hill Area PSEG-2026-0003 |
Cherry Hill Station | No figures printed |
| 2026-07-17 | SRRTEP Southern Item 01 - DOM Supplemental Projects p. 3 |
Lewis Drive 115 kV Delivery - MEC DOM-2025-0029 |
Brodnax Clubhouse Lewis Drive New Rogers Rd Sub |
Status Construction (Under construction) Cost $5.3M In service 10/01/2026 Load 25 MW |
| 2026-07-17 | SRRTEP Western Item 01 - AMPT Supplemental Projects p. 3 |
Oberlin, OH AMPT 2026-009 |
None named | Load 21 MW |
| 2026-07-17 | SRRTEP Western Item 01 - AMPT Supplemental Projects p. 4 |
Herbert sub 100 MW load request AMPT-2026-012 |
Herbert | Load 100 MW |
| 2026-07-17 | SRRTEP Western Item 01 - AMPT Supplemental Projects p. 5 |
Genoa, OH AMPT-2026-013 |
Genoa South substation | Load 500 MW |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 3 |
Misoperations Relay APS-2026-008 |
Klines Mill Meadow Brook Riverton |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 4 |
Butler- Karns City 138 kV Line APS-2026-046 |
Armstrong Substation Butler Karns City |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 6 |
Mitchell Substation APS-2024-073 |
Charleroi Mitchell Yukon |
Status Conceptual Cost $11.01 M In service 06/02/2028 |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 8 |
Misoperations Relays APS-2024-086 |
Junction Substation Parr Run |
Status Conceptual Cost $4.67 M In service 12/31/2028 |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 10 |
Misoperations Relays APS-2025-005 |
Shepherdstown Substation Sleepy Hollow |
Status Conceptual Cost $2.60 M In service 08/04/2028 |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 12 |
Smithton Substation APS-2026-001 |
Allenport Belmon Charleroi Iron Bridge Mitchell Smithton Substation Yukon |
Status Conceptual Cost $11.52 M In service 12/17/2027 Load 10 MW |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 3 |
Longview Substation ATSI-2026-027 |
Cook Longview Nottingham Ontario |
Load 80 MW |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 5 |
Greenfield Substation ATSI-2026-047 |
Castalia Covert Greenfield Hayes Lakeview Nasa New Departure |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 7 |
Beaver - Henrietta 138 kV Line ATSI-2026-049 |
Beaver Henrietta |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 8 |
Ashtabula - Leroy Center 138 kV Line ATSI-2026-051 |
Ashtabula Austinburg Leroy Center Sanborn Spruce Stacy |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 10 |
Broadview - Finley 138 kV Line ATSI-2026-053 |
Broadview Finley |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 12 |
Medina/Seville Area ATSI-2021-021 |
Abbe Medina North Medina Ryan Substation Seville Substation Star West Akron West Medina Substation |
Status Conceptual |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 19 |
Lockwood Road - Richland 138 kV Line ATSI-2026-041 |
Lockwood Road Richland |
Status Conceptual |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 22 |
Cloverdale - Torrey 138 kV Line & Canton Central - Cloverdale 138 kV Line ATSI-2026-044 |
Canton Central Cloverdale Torrey |
Status Conceptual Cost $0M In service 06/22/2028 |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 24 |
Black River-Shinrock 69 kV Rebuild ATSI-2024-072 |
Axtel Baumhart Black River Greenfield Shinrock Washington |
Status Conceptual Cost $67.65M In service 12/31/2029 |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 3 |
Mound, OH AEP-2026-OH027 |
Mound Street | No figures printed |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 4 |
OH/Kenny, OH/Cliton, OH/Roberts AEP-2026-OH031 |
Clinton Kenny |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 5 |
Muskingum, OH AEP-2026-OH030 |
None named | In service December of 2028 Load 240 MW |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 6 |
Carrothers-Willard 69kV AEP-2026-OH005 |
Carrothers East Willard North Willard South Greenwich Willard Williard |
No figures printed |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 9 |
Maliszewski Station Improvements AEP-2026-OH008 |
Hyatt Maliszewski Polaris |
Status Scoping (Conceptual) Cost $12.57 M In service 09/15/2027 Load 25 MW |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 13 |
Timken Mercy Rebuild AEP-2023-OH009 |
Eighth Street Schroyer Avenue Stadium Park Timken Mercy |
Status Engineering Cost $7.195 M In service 05/04/2028 |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 17 |
Corey - Pigeon River 69kV rebuild AEP-2023-IM012 |
Corey Florence Road HMD Pigeon River White Pigeon |
Status Scoping (Conceptual) Cost $43.358 M In service 09/27/2029 |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 21 |
Hartford - Valley - Corey 138kV Rebuild AEP-2023-IM011 |
Brody Corey Flowerfield SS Hartford Hydramatic Moore Park Stinger Valley |
Status Scoping (Conceptual) Cost $162.85 M In service 09/23/2031 |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 26 |
Addison - Lick, Addison - Haners Upgrades AEP-2022-OH067, AEP-2022-OH069 |
Addison Chickamauga New Gavin Haners Lick North Proctorville Rio Sporn |
Status Scoping (Conceptual) Cost $165.726 M In service 10/08/2032 Load 20 MW |
| 2026-07-17 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 3 |
Des Plaines 345KV/138KV TR 34KV Tertiary Caps ComEd-2026-010 |
Busse Des Plaines Golf Mill Substation |
Status Engineering Cost $ 10.91M In service 12/31/2027 (Phase 1), 12/31/28 (Phase 2) |
| 2026-07-07 | TEAC Informational Only - 5034 500 kV Line Cut-in Immediate Need Assessment - Need Statement p. 1 |
PECO Cut-in the ‘5034’ 500 kV line into Bramah 500 kV Substation Immediate Need – July 7, 2026 | Bramah New Conastone Delta York Peach Bottom |
Cost $12 million In service October 14, 2027 |
| 2026-07-07 | TEAC Item 03 - 5034 Immediate Need Assessment - Second Read p. 6 |
Cut-in the ‘5034’ 500 kV line in and out of the Bramah (North Delta) 500 kV Substation B4089.1 and B4089.2 |
Bramah Conastone Delta York North Delta Peach Bottom |
Cost $12M In service 10/14/2027 |
| 2026-07-07 | TEAC Item 04 - UGI Supplemental Projects p. 3 |
UGI-2026-0003 | Mountain Substation Newport Substation |
Status Engineering Cost $107.2 M In service 03/29/2030 Load 500MW |
| 2026-07-07 | TEAC Item 05 - ATSI Supplemental Projects p. 3 |
Chamberlin-Harding 345 kV S-21 line ATSI-2026-048 |
Chamberlin Harding |
No figures printed |
| 2026-07-07 | TEAC Item 06 - APS Supplemental Projects p. 3 |
New Customer Connection APS-2026-041 |
Ballenger Substation Doubs Lime Kiln |
In service 12/31/2032 Load approximately 1000 MW |
| 2026-07-07 | TEAC Item 06 - APS Supplemental Projects p. 4 |
New Customer Connection APS-2026-039 |
Doubs Sage |
In service 4/30/2032 Load approximately 368 MW |
| 2026-07-07 | TEAC Item 06 - APS Supplemental Projects p. 6 |
Rhodes Lane - Yukon 500 kV Line APS-2025-029 |
Rhodes Lane Substation Yukon |
Status Conceptual Cost $5.45M In service 05/12/2028 |
| 2026-07-07 | TEAC Item 06 - APS Supplemental Projects p. 8 |
Shingletown Substation APS-2023-059, PN-2023-022 |
Dale Summit Lewistown Substation Shawville Substation Shingletown Substation |
Status Conceptual Cost $19.11M In service 06/25/2029 Load approximately 82.7 MW |
| 2026-07-07 | TEAC Item 07 - JCPL Supplemental Projects p. 3 |
Traynor No. 13 230-34.5kV Transformer, NJ JCPL-2024-017 |
Traynor Whippany |
Status Conceptual Cost $16.73M In service 05/24/2030 |
| 2026-07-07 | TEAC Item 07 - JCPL Supplemental Projects p. 5 |
Traynor No. 14 230-34.5kV Transformer, NJ JCPL-2024-018 |
Traynor Whippany |
Status Conceptual Cost $12.35M In service 12/20/2030 |
| 2026-07-07 | TEAC Item 07 - JCPL Supplemental Projects p. 7 |
Lakewood, NJ JCPL-2026-026 |
Cookstown Jackson New Lakehurst Lakewood Larrabee Manchester Manitou Metedeconk Pleasant Plains South Lakewood Vermont Ave Whitings |
Status Conceptual Cost $292.4M In service 12/31/2032 |
| 2026-07-07 | TEAC Item 08 - MetEd Supplemental Projects p. 3 |
Foxhill 230 kV Ring Bus, PA ME-2024-007 |
Foxhill Substation Monroe Substation Shawnee Substation |
Status Conceptual Cost $11.80M In service 12/21/2029 Load 50 MW |
| 2026-07-07 | TEAC Item 09 - Penelec Supplemental Projects p. 3 |
Shawville and Lewistown 230 kV Terminal Upgrades, PA PN-2023-022 |
Dale Summit Lewistown Shawville Shingletown |
Status Conceptual Cost $4.97M In service 06/15/2028 Load 82.7 MW |
| 2026-07-07 | TEAC Item 10 - AEP Supplemental Projects p. 3 |
Hanging Rock, OH/Baker, KY AEP-2026-AP007 |
Baker Hanging Rock |
Load 1000 MW |
| 2026-07-07 | TEAC item 11 - Dayton Supplemental Projects p. 5 |
Dayton Transmission Zone M-3 Process Dayton-2025-001, Dayton-2025-002 - UPDATE |
Atlanta Clay Clinton Fayette Greene |
Status Engineering Cost $589.8 M In service 01/2031 Load 1.5 GW |
| 2026-07-07 | TEAC item 11 - Dayton Supplemental Projects p. 7 |
Dayton Transmission Zone M-3 Process Dayton-2026-001 |
Stuart | Status Conceptual Cost $51.7M In service 11/01/2028 Load 1300 MW |
| 2026-07-07 | TEAC Item 12 - ComEd Supplemental Projects p. 2 |
Customer in Hoffman Estates ComEd-2024-016 |
None named | Status Withdraw Need (Cancelled) Load 612 MW |
| 2026-07-07 | TEAC Item 12 - ComEd Supplemental Projects p. 2 |
Customer in DeKalb ComEd-2025-010 |
None named | Status Withdraw Need (Cancelled) Load 860 MW |
| 2026-07-07 | TEAC Item 12 - ComEd Supplemental Projects p. 4 |
Blue Island Hardening ComEd-2026-011 |
Blue Island | No figures printed |
| 2026-07-07 | TEAC Item 12 - ComEd Supplemental Projects p. 6 |
Burnham 345KV/138KV TR ComEd-2026-009 |
Burnham | Status Engineering In service Phase 1: 12/31/2026, Phase 2: 12/31/2028 |
| 2026-07-07 | TEAC Item 12 - ComEd Supplemental Projects p. 8 |
Customer in Grayslake ComEd-2025-005 |
Grayslake New Hanover Tap Blue Hanover Tap Red Libertyville Silver Lake Spaulding Tollway Wayne |
Status Conceptual Cost $248.8M In service 6/1/2027 (Phase 1), 6/1/2029 (Phase 2), 6/1/2030 (Phase 3), 6/1/2029 (138KV System Reinforcement), 6/1/2030 (345KV Auto, 345KV Silverlake-Grayslake, 345KV Wayne-Tollway), 6/1/2031 (345KV Tollway-Grayslake) Load 1,550 MW |
| 2026-07-07 | TEAC Item 12 - ComEd Supplemental Projects p. 13 |
345KV STATCOMS ComEd-2024-014, ComEd-2024-022, ComEd-2025-005, ComEd-2025-011, ComEd-2025-013, ComEd-2025-015, ComEd-2025-016, ComEd-2025-020 |
Bryon Charter Grove New Hiawatha Itasca Silver Lake Wayne |
Status Conceptual Cost $472.0M In service 06/01/2031 |
| 2026-07-07 | TEAC Item 13 - DEOK Supplemental Projects p. 3 |
Customer Load Request DEOK-2026-004 |
None named | Load 300 MW |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency DOM-2026-0026 |
Cannon Branch | No figures printed |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2022-0062-DNH |
Allied Bermuda Hundred Shand Creek Tropical New |
Status Conceptual In service Q4 2031 |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2023-0023 - DNH |
Elmont | Status Conceptual Cost $17.5M In service 12/31/2031 |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 9 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2024-0036-DNH |
Bremo Carson James Hill New Locks Midlothian |
Status Conceptual In service Q4 2031 |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 11 |
Dominion Transmission Zone: Supplemental Sunset Hill 230 kV Delivery – Install 2nd TX - DEV DOM-2025-0030 |
Sunset Hill Substation | Status Engineering Cost $1.6M In service 12/31/2028 Load 100 MW |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 13 |
Dominion Transmission Zone: Supplemental Elm Farm 230 kV Delivery – Install 2nd TX - DEV DOM-2025-0031 |
Elm Farm Substation | Status Engineering Cost $1.3M In service 12/31/2027 Load 69 MW |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 15 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2019-0021, DOM-2024-0022, DOM-2024-0023, DOM-2024-0024 - DNH |
Bermuda Hundred New Chickahominy Enon substation Hopewell Meadowville New Shand Creek New Sycamore Springs New |
Status Conceptual Cost 101.7M In service Q4 2030 |
| 2026-07-07 | TEAC Item 15 - Reliability Analysis Update p. 6 |
PSEG Transmission Zone: Baseline b3794.1 |
Waldwick | Cost $45.4M In service 6/1/2028 |
| 2026-07-07 | TEAC Item 15 - Reliability Analysis Update p. 7 |
Approved Targeted Market Efficiency Project (TMEP) b2971: Burnham – Munster 345kV (ComEd-NIPS) b2971 |
Burnham Munster |
Cost $7M In service 6/1/2020 |
| 2026-07-07 | TEAC Item 15 - Reliability Analysis Update p. 8 |
Scope Change b2971.1: Burnham-Munster Sag Mitigation b2971.1 |
Burnham Munster |
Cost $500,000 In service 6/1/2020 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.