Wilton Center
Named in 6 PJM planning documents for 5 projects, from October 8, 2024 to November 4, 2025.
PJM interconnection queue
A PJM queue substation page has the same name: Wilton Center (IL) — 5 queue requests filed, 1 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Wilton Center BT 4-5 CB b3902.1 |
Not printed | $2.7 M | 12/1/2029 | Not printed | 2024-12-03 TEAC |
| Wilton Center 765/345 kV b4006.1 |
Not printed | $45.81 M | 12/1/2030 | Not printed | 2025-11-04 TEAC |
| Wilton Center BT 4-5 CB | Not printed | $2.7 M | 12/1/2029 | Not printed | 2024-11-06 TEAC |
| Wilton Center 345 kV CBs ComEd-2023-010 · s3156 |
Engineering | $12.7M | 12/31/24 | Not printed | 2024-10-08 TEAC |
| Wilton Center 765/345 kV 2025-W1-906 |
Not printed | $45.81 M | 12/1/2030 | Not printed | 2025-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | LORETTO; WILTON; WILTON CENTER → LORETTO; WILTON CENTER | 2024-10-08 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 8 |
Wilton Center 345 kV CBs | “at Wilton Center substation” 345 kV |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 7 |
Wilton Center 765/345 kV | “Install a new 765/345 kV TR91 transformer at Wilton Center substation” 765/345 kV |
| 2025-10-08 | TEAC Item 13 - Reliability Analysis Update p. 6 |
Wilton Center 765/345 kV | “Install a new 765/345 kV TR91 transformer at Wilton Center substation” 765/345 kV |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 51 |
Wilton Center BT 4-5 CB | “Replace the Wilton Center 345 kV BT 4-5 circuit breaker” 345 kV |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 32 |
Wilton Center BT 4-5 CB | “Replace the Wilton Center 345 kV BT 4-5 circuit breaker” 345 kV |
| 2024-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2024 p. 8 |
Wilton Center 345 kV CBs | “at Wilton Center substation were installed in 1970” 345 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.