Substation Scout

Wilton Center

Named in 6 PJM planning documents for 5 projects, from October 8, 2024 to November 4, 2025.

Existingdescribed as
COMEDzone
345 kV, 765/345 kVkV as printed
6mentions

PJM interconnection queue

A PJM queue substation page has the same name: Wilton Center (IL) — 5 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Wilton Center BT 4-5 CB
b3902.1
Not printed $2.7 M 12/1/2029 Not printed 2024-12-03
TEAC
Wilton Center 765/345 kV
b4006.1
Not printed $45.81 M 12/1/2030 Not printed 2025-11-04
TEAC
Wilton Center BT 4-5 CB Not printed $2.7 M 12/1/2029 Not printed 2024-11-06
TEAC
Wilton Center 345 kV CBs
ComEd-2023-010 · s3156
Engineering $12.7M 12/31/24 Not printed 2024-10-08
TEAC
Wilton Center 765/345 kV
2025-W1-906
Not printed $45.81 M 12/1/2030 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named LORETTO; WILTON; WILTON CENTER → LORETTO; WILTON CENTER 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2024 RTEP p. 8
Wilton Center 345 kV CBs “at Wilton Center substation”
345 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 7
Wilton Center 765/345 kV “Install a new 765/345 kV TR91 transformer at Wilton Center substation”
765/345 kV
2025-10-08 TEAC
Item 13 - Reliability Analysis Update p. 6
Wilton Center 765/345 kV “Install a new 765/345 kV TR91 transformer at Wilton Center substation”
765/345 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 51
Wilton Center BT 4-5 CB “Replace the Wilton Center 345 kV BT 4-5 circuit breaker”
345 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 32
Wilton Center BT 4-5 CB “Replace the Wilton Center 345 kV BT 4-5 circuit breaker”
345 kV
2024-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2024 p. 8
Wilton Center 345 kV CBs “at Wilton Center substation were installed in 1970”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this