Named in 2 PJM planning documents for 1 project, on October 6, 2026.

Newdescribed as
ATSIzone
138 kVkV as printed
2mentions

Described as new: “Rebuild Orrville's Power Plant sub at a new location, to be called Mineral Springs sub.” — source, page 69

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Orrville, OH
AMPT-2023-004 · s3832.1 (AMPT), s3832.2 (ATSI), s3832.3 (AMPT), s3832.4 (AMPT), s3832.5 (AMPT), s3832.6 (AEP)
Engineering $68.741M 8/30/2030 60 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $71.7 M → $68.741M 2025-09-19 2026-10-06
In-service date AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028) → 8/30/2030 2025-09-19 2026-10-06
Status unknown (Engineering (AMPT), Conceptual (AEP and FE)) → engineering (Engineering) 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE 2026-10-06 Not reported
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT Not reported Not reported
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR Not reported Not reported
Substations named APPLE AVE; APPLE AVE SUBS; E WOOSTER; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR 2026-10-06 2026-10-06
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 69
Orrville, OH “Rebuild Orrville's Power Plant sub at a new location, to be called Mineral Springs sub.”
138 kV
2026-09-23* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2026 RTEP p. 69
Orrville, OH “Rebuild Orrville's Power Plant sub at a new location, to be called Mineral Springs sub.”