Weirton Substation
Named in 13 PJM planning documents for 10 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
17mentions
Also printed as: Weirton
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Misoperation Relay Projects APS-2023-064 · s3158.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2023-064 to APS-2023-066, APS-2023-069 |
Not printed | $1.7 | 06/01/2024 | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2024-008, APS-2024-011, APS-2024-013, APS-2024-015, APS-2024-016, APS-2024-024, APS-2024-030 to APS-2024-034 · s3470.1, s3471.1, s3472.1, s3473.1, s3474.1, s3475.1, s3476.1, s3477.1, s3478.1, s3479.1, s3480.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Weirton - Wylie Ridge 138 kV Misoperation Relays APS-2024-025 · s3771.1 |
Not printed | $4.50M | 07/20/2029 | Not printed | 2026-10-06 TEAC |
| Misoperation Relay Projects APS-2024-032, APS-2024-033, APS-2024-034 · s3478.1, s3479.1, s3480.1 |
Not printed | Not printed | Not printed | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118 |
Not printed | Not printed | Not printed | Not printed | 2024-12-13 SRRTEP Western |
| Misoperation Relay Projects APS-2024-098 to APS-2024-100, APS-2025-015 |
Conceptual | Not printed | Not printed | Not printed | 2025-06-13 SRRTEP Western |
| Misoperation Relay Projects APS-2024-116 · s3643.1, s3643.2 |
Not printed | $7.04 M | 04/27/2029 | Not printed | 2025-10-08 TEAC |
| Misoperation Relay Projects APS-2025-015 · s3710.1 |
Not printed | $1.9 | 12/31/2029 | Not printed | 2025-10-08 TEAC |
| New Customer Connection APS-2026-006 |
Conceptual | $1.40 M | 07/17/2028 | 29 MW | 2026-06-17 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ANTIETAM; BEDINGTON; BELMONT; BETHELBORO; CARNEGIE; CHARLEROI; DONEGAL; E HAGERSTOWN; EAST HAGERSTOWN; EDGELAWN; HAMPSHIRE; IRON BRIDGE; MARLOWE; PAPER CITY; RENO TAP; RIDGELEY; RIDGWAY; TIDD; TRISSLER; WEIRTON; YUKON → ANTIETAM; BETHELBORO; CHARLEROI; EAST HAGERSTOWN; PAPER CITY; RIDGWAY; YUKON | 2024-10-08 | Not reported |
| Substations named | CARNEGIE; TIDD AEP; WEIRTON → CARNEGIE; TIDD; WEIRTON | 2025-04-11 | 2025-10-08 |
| In-service date | 4/1/2026 → 07/17/2028 | 2026-03-19 | 2026-06-17 |
| Substations named | BUFFALO JUNCTION; CECIL; WEIRTON; WINDSOR → CECIL; WEIRTON; WINDSOR | 2026-03-19 | 2026-06-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 11 |
Weirton - Wylie Ridge 138 kV Misoperation Relays | “Replace 138 kV disconnect switches, line trap, substation conductor, line tuners, CCVT,
and relaying at Weirton Substation” 138 kV |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 11 |
Weirton - Wylie Ridge 138 kV Misoperation Relays | “relaying at Weirton Substation” |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 119 |
Misoperation Relay Projects | “At Weirton, replace line trap and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 61 |
Misoperation Relay Projects | “At Weirton Substation, replace line trap and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 28 |
Misoperation Relay Projects | “Weirton Substation: At Weirton, replace circuit breaker” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 54 |
Misoperation Relay Projects | “At Weirton Substation, replace wave trap” 138 kV |
| 2026-06-17 | SRRTEP Western Item 03 - APS Supplemental Projects p. 16 |
New Customer Connection | “adjust relay settings at Cecil, Weirton, and Windsor substations” 138 kV |
| 2026-03-19 | SRRTEP Western Item 01 - APS Supplemental Projects p. 3 |
New Customer Connection | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
Misoperation Relay Projects | “At Weirton, replace circuit breaker, disconnect switches” 138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 54 |
Misoperation Relay Projects | “At Weirton Substation, replace wave trap, substation conductor” 138 kV |
| 2025-08-15 | SRRTEP Western Item 04 - APS Supplemental Projects p. 8 |
Weirton - Wylie Ridge 138 kV Misoperation Relays | “Replace 138 kV disconnect switches, line trap, substation conductor, line tuners, CCVT, and relaying at Weirton Substation” 138 kV |
| 2025-06-13 | SRRTEP Western Item 06 - APS Supplemental Projects p. 6 |
Misoperation Relay Projects | “At Weirton Substation, replace wave trap” 138 kV |
| 2025-04-11 | SRRTEP Western Item 06 - APS Supplemental Project p. 6 |
Misoperation Relay Projects | No role wording 138 kV |
| 2025-02-14 | SRRTEP Western Item 04 - APS Supplemental Projects p. 8 |
Misoperation Relay Projects | “At Weirton, replace circuit breaker, disconnect switches, wave trap, substation conductor, line turner and coax, and relaying.” 138 kV |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 6 |
Misoperation Relay Projects | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 119 |
Misoperation Relay Projects | “At Weirton, replace line trap and relaying” |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 61 |
Misoperation Relay Projects | “At Weirton Substation, replace line trap and
relaying” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.