Substation Scout

Eldred

Named in 6 PJM planning documents for 4 projects, from July 17, 2025 to October 6, 2026.

Existingdescribed as
PPLzone
230kV, 69kVkV as printed
8mentions

PJM interconnection queue

A PJM queue substation page has the same name: Eldred (PA) — 6 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL-2023-0012 Conceptual $1.0M 11/30/2025 10 MVA 2026-09-08*
SRRTEP Mid-Atlantic
Gordon, PA
PPL-2025-0008
Conceptual $231.65 M 05/30/2028 600MW 2026-10-06
TEAC
Mount Carmel, PA
PPL-2025-0011
Conceptual $0.9 M 12/10/2026 Not printed 2026-10-06
TEAC
Hegins, PA
PPL-2026-0018
Not printed Not printed 11/30/2030 Not printed 2026-03-18
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 5/30/2027 2025-05-06 2025-10-08
In-service date 5/30/2027 → 05/30/2028 2025-10-08 2026-10-06
Substations named CLEVELAND; ELDRED → BLASCHAK; CLEVELAND; ELDRED 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 25
Gordon, PA “Install two new terminals at Eldred Substation by building out two bays in DBDB future BAAH arrangement”
230kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 7
Mount Carmel, PA No role wording
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 25
Gordon, PA “Install two new terminals at Eldred Substation by building out two bays in DBDB future BAAH arrangement”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 7
Mount Carmel, PA “existing Eldred - Cleveland 69kV line”
69kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 17
PPL-2023-0012 No role wording
69kV
2026-03-18 SRRTEP Mid-Atlantic
Item 09 - PPL Supplemental Projects p. 7
Hegins, PA No role wording
69kV
2025-10-08 TEAC
Item 09 - PPL Supplemental Projects p. 6
Gordon, PA “Install two new terminals at Eldred Substation by building out two bays in DBDB future BAAH arrangement”
230kV
2025-07-17 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 6
Mount Carmel, PA “existing Eldred - Cleveland 69kV line”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this