Eldred
Named in 6 PJM planning documents for 4 projects, from July 17, 2025 to October 6, 2026.
PJM interconnection queue
A PJM queue substation page has the same name: Eldred (PA) — 6 queue requests filed, 0 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| PPL-2023-0012 | Conceptual | $1.0M | 11/30/2025 | 10 MVA | 2026-09-08* SRRTEP Mid-Atlantic |
| Gordon, PA PPL-2025-0008 |
Conceptual | $231.65 M | 05/30/2028 | 600MW | 2026-10-06 TEAC |
| Mount Carmel, PA PPL-2025-0011 |
Conceptual | $0.9 M | 12/10/2026 | Not printed | 2026-10-06 TEAC |
| Hegins, PA PPL-2026-0018 |
Not printed | Not printed | 11/30/2030 | Not printed | 2026-03-18 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 05/2027 → 5/30/2027 | 2025-05-06 | 2025-10-08 |
| In-service date | 5/30/2027 → 05/30/2028 | 2025-10-08 | 2026-10-06 |
| Substations named | CLEVELAND; ELDRED → BLASCHAK; CLEVELAND; ELDRED | 2026-10-06 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 25 |
Gordon, PA | “Install two new terminals at Eldred Substation by building out two bays in DBDB future BAAH arrangement” 230kV |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 7 |
Mount Carmel, PA | No role wording |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 25 |
Gordon, PA | “Install two new terminals at Eldred Substation by building out two bays in DBDB
future BAAH arrangement” 230kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 7 |
Mount Carmel, PA | “existing Eldred - Cleveland 69kV line” 69kV |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 17 |
PPL-2023-0012 | No role wording 69kV |
| 2026-03-18 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects p. 7 |
Hegins, PA | No role wording 69kV |
| 2025-10-08 | TEAC Item 09 - PPL Supplemental Projects p. 6 |
Gordon, PA | “Install two new terminals at Eldred Substation by building out two bays in DBDB future BAAH arrangement” 230kV |
| 2025-07-17 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 6 |
Mount Carmel, PA | “existing Eldred - Cleveland 69kV line” 69kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.