Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to February 3, 2026.

Newdescribed as
COMEDzone
345 kV, 345kVkV as printed
5mentions

Described as new: “to a new Keslinger substation 345 kV breaker-and-a-half bus” — source, page 15

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Dekalb
ComEd-2024-001 · s3342.1, s3342.2
Engineering $215M 12/31/27 210 MW 2025-10-08
TEAC
Customer in DeKalb
ComEd-2025-009
Conceptual $245M 12/4/2029 504 MW 2026-02-03
TEAC
Customer in DeKalb
ComEd-2025-010
Conceptual $30M 10/31/2028 860 MW 2026-02-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $215M → $175M 2025-10-08 Not reported
Cost estimate
prior value printed on the same page
$175M → $215M 2025-10-08 2025-10-08
Cost estimate $175M → $215M 2024-10-08 2025-10-08
Status engineering (Engineering) → conceptual (Conceptual) 2025-10-08 Not reported
Status conceptual (Conceptual) → engineering (Engineering) 2024-10-08 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2024 RTEP p. 15
Customer in Dekalb “to a new Keslinger substation”
345 kV
2026-02-03 TEAC
Item 10 - ComEd Supplemental Projects p. 5
Customer in DeKalb “from Keslinger substation (s3342.1) to new Gurler substation”
2026-02-03 TEAC
Item 10 - ComEd Supplemental Projects p. 7
Customer in DeKalb “existing breaker-and-a-half configuration at Keslinger”
345kV
2025-10-08 TEAC
Item 11 - ComEd Supplemental Projects p. 8
Customer in Dekalb “new Keslinger substation”
345 kV
2024-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2024 p. 15
Customer in Dekalb “to a new Keslinger substation 345 kV breaker-and-a-half bus”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.