Gainesville
Named in 7 PJM planning documents for 8 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
DOMzone
230 kVkV as printed
13mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Do No Harm (DNH) Analysis DOM-2020-0026-DNH · s2340.1 & s2340.2 |
Conceptual | $1.5M | 12/31/2026 | Not printed | 2024-10-08 TEAC |
| Do No Harm (DNH) Analysis DOM-2022-0045-DNH · s3035.2 |
Conceptual | $139.0M (Total) | 12/31/2027 | Not printed | 2026-09-08* SRRTEP Southern |
| Burrell 230kV Delivery - NOVEC DOM-2022-0046 · s3036 |
Engineering | $16.0M | 12/30/2028 | 20.8 MW | 2026-10-06 TEAC |
| Trident 230kV Delivery - NOVEC DOM-2023-0012 · s3071 |
Engineering | $15.75 M | 09/01/2025 | 100 MW | 2024-10-08 TEAC |
| Do No Harm Analysis DOM-2023-0013-DNH |
Conceptual | $88.0M | 06/15/2029 | 300 MW | 2024-12-03 TEAC |
| Old Limb 230kV Delivery – DEV DOM-2024-0015 · s3704.1 |
Engineering | $35.0 M | 8/01/2027 | 148 MW | 2025-10-08 TEAC |
| Aphrodite 230kV Delivery - NOVEC DOM-2024-0061 |
Cancelled | $14M | 09/30/2027 | 100 MW | 2026-09-08 TEAC |
| Do No Harm Analysis DOM-2024-0063-DNH · s3699.3, s3699.4, s3699.5 |
Conceptual | $24.0M | 06/01/2029 | Not printed | 2025-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate prior value printed on the same page |
$35.0M → $1.5M | 2024-10-08 | 2024-10-08 |
| Substations named | ELK RUN; GAINESVILLE; LOUDOUN; MORRISVILLE; REMINGTON CT; ROLLINS FORD → ELK RUN; GAINESVILLE; REMINGTON CT; ROLLINS FORD | 2024-10-08 | Not reported |
| Substations named | BRISTERS; HORNBAKER; NOKESVILLE; VINT HILL → BRICKYARD; BRISTERS; CLIFTON; DAWKINS BRANCH; GAINESVILLE; HORNBAKER; NOKESVILLE; RAILROAD; VINT HILL | 2024-10-08 | Not reported |
| In-service date | 12/30/2028 → 01/02/2026 | 2026-10-06 | Not reported |
| In-service date | 01/02/2026 → 12/30/2028 | 2024-10-08 | 2025-10-08 |
| Substations named | GAINESVILLE; LOUDOUN; MINT SPRINGS → BURRELL; MINT SPRINGS | 2024-10-08 | 2025-10-08 |
| Substations named | DAWKINS BRANCH; DEVLIN; GAINESVILLE; LIBERTY; PEGASUS; RAILROAD; ROLLINS FORD; VINT HILL → DAWKINS BRANCH; DEVLIN; PEGASUS | 2024-12-03 | 2025-10-08 |
| Status | engineering (Engineering) → cancelled (Canceled) | 2025-10-08 | 2026-09-08 |
| Substations named | APHRODITE → APHRODITE; GAINESVILLE; LOUDOUN | 2025-10-08 | 2026-09-08 |
| Substations named | BRICKYARD; CLIFTON; DEVLIN; GAINESVILLE; NOKESVILLE; RAILROAD; ROLLINS FORD; VINT HILL; WHEELER → DEVLIN; GAINESVILLE; VINT HILL; WHEELER | 2025-05-06 | 2025-10-08 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 27 |
Burrell 230kV Delivery - NOVEC | No role wording |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 14 |
Aphrodite 230kV Delivery - NOVEC | No role wording |
| 2026-09-08* | SRRTEP Southern Dominion p. 124 |
Trident 230kV Delivery - NOVEC | “Line #2161 (Gainesville – Wheeler)” |
| 2026-09-08* | SRRTEP Southern Dominion p. 4 |
Do No Harm (DNH) Analysis | “At Gainesville, upgrade (2) 230 kV circuit breakers” 230 kV |
| 2026-09-08* | SRRTEP Southern Dominion p. 60 |
Do No Harm (DNH) Analysis | No role wording |
| 2026-09-08* | SRRTEP Southern Dominion p. 63 |
Burrell 230kV Delivery - NOVEC | No role wording |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 63 |
Do No Harm Analysis | No role wording |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 79 |
Old Limb 230kV Delivery – DEV | No role wording |
| 2025-05-06 | TEAC Item 09 - DOM Supplemental Projects p. 13 |
Do No Harm Analysis | No role wording |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 9 |
Do No Harm Analysis | No role wording |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 124 |
Trident 230kV Delivery - NOVEC | No role wording |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 4 |
Do No Harm (DNH) Analysis | “At Gainesville, upgrade (2) 230 kV circuit breakers and terminal equipment” 230 kV |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 63 |
Burrell 230kV Delivery - NOVEC | No role wording |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.