Named in 4 PJM planning documents for 1 project, from September 9, 2025 to October 6, 2026.

Existingdescribed as
COMEDzone
345 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Lockport 345 kV BT 1-2 CB
ComEd-2025-018 · s4008
Engineering $2.2M 12/31/2025 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named LOCKPORT → LOCKPORT; LOMBARD 2025-09-09 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 12
Lockport 345 kV BT 1-2 CB “Lockport 345 kV 1-2 BT oil circuit breaker was installed in 2001”
345 kV
2026-09-30* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2026 RTEP p. 12
Lockport 345 kV BT 1-2 CB “Lockport 345 kV 1-2 BT oil circuit breaker was installed in 2001”
345 kV
2025-10-08 TEAC
Item 11 - ComEd Supplemental Projects p. 5
Lockport 345 kV BT 1-2 CB “Replace existing 345 kV oil BT1-2 CB”
345 kV
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 13
Lockport 345 kV BT 1-2 CB “Lockport 345 kV 1-2 BT oil circuit breaker was installed in 2001.”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.