Substation Scout

Manchester

Named in 3 PJM planning documents for 3 projects, from January 6, 2026 to July 7, 2026.

Existingdescribed as
JCPLzone
230 kV, 230-34.5 kVkV as printed
3mentions

Also printed as: Manchester Substation

PJM interconnection queue

A PJM queue substation page has the same name: Manchester (NJ) — 2 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cookstown – Larrabee – Whitings 230 kV Line
JCPL-2022-005
Not printed $50.4M 12/1/2024 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Manchester 230-34.5 kV Substation
JCPL-2026-001
Not printed Not printed Not printed 23 MW 2026-01-06
TEAC
Lakewood, NJ
JCPL-2026-026
Conceptual $292.4M 12/31/2032 Not printed 2026-07-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named COOKSTOWN; LARRABEE; WHITINGS → COOKSTOWN; LARRABEE; MANCHESTER; WHITINGS 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 60
Cookstown – Larrabee – Whitings 230 kV Line No role wording
230 kV
2026-07-07 TEAC
Item 07 - JCPL Supplemental Projects p. 9
Lakewood, NJ No role wording
230 kV
2026-01-06 TEAC
Item 03 - JCPL Supplemental Projects p. 3
Manchester 230-34.5 kV Substation “The existing Manchester Substation”
230-34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.