North Hanover
Named in 7 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
METEDzone
115 kVkV as printed
7mentions
Also printed as: North Hanover Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Jackson – North Hanover 115 kV Line b4011.3 |
Not printed | $61.79 M | 6/1/2030 | Not printed | 2025-11-13 SRRTEP Mid-Atlantic |
| Jackson – North Hanover 115 kV Line | Not printed | $61.79 M | 6/1/2030 | Not printed | 2025-10-16 SRRTEP Mid-Atlantic |
| Hunterstown – North Hanover 115 kV Line Customer Connection ME-2024-011 · s3435.1 |
Not printed | $1.70M | 1/11/2027 | 22 MVA | 2024-10-08 TEAC |
| North Hanover 115 kV Breaker and a Half Substation ME-2024-012 · s4016.1 |
Not printed | $36.79M | 12/29/2028 | 59 MW | 2026-10-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 23 |
North Hanover 115 kV Breaker and a Half Substation | “Convert the 115 kV yard at North Hanover Substation into an 11 breaker, breaker-and” 115 kV |
| 2026-10-06 | TEAC Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 22 |
North Hanover 115 kV Breaker and a Half Substation | “Convert the 115 kV yard at North Hanover Substation into an 11 breaker, breaker-and-ahalf configuration” 115 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 35 |
Hunterstown – North Hanover 115 kV Line Customer Connection | “Modify relay settings at North Hanover and Hunterstown substations” 115 kV |
| 2026-06-16 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 7 |
North Hanover 115 kV Breaker and a Half Substation | “North Hanover Substation is in a straight bus configuration with terminals to three distribution transformers” 115 kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16 |
Jackson – North Hanover 115 kV Line | “Replace limiting conductors, line relaying, and disconnect switches at North Hanover” 115 kV |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16 |
Jackson – North Hanover 115 kV Line | “Replace limiting conductors, line relaying, and disconnect switches at North Hanover” 115 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 35 |
Hunterstown – North Hanover 115 kV Line Customer Connection | “Modify relay settings at North Hanover and Hunterstown substations” 115 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.