Substation Scout

North Hanover

Named in 7 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
METEDzone
115 kVkV as printed
7mentions

Also printed as: North Hanover Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Jackson – North Hanover 115 kV Line
b4011.3
Not printed $61.79 M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Jackson – North Hanover 115 kV Line Not printed $61.79 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Hunterstown – North Hanover 115 kV Line Customer Connection
ME-2024-011 · s3435.1
Not printed $1.70M 1/11/2027 22 MVA 2024-10-08
TEAC
North Hanover 115 kV Breaker and a Half Substation
ME-2024-012 · s4016.1
Not printed $36.79M 12/29/2028 59 MW 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2026 RTEP p. 23
North Hanover 115 kV Breaker and a Half Substation “Convert the 115 kV yard at North Hanover Substation into an 11 breaker, breaker-and”
115 kV
2026-10-06 TEAC
Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 22
North Hanover 115 kV Breaker and a Half Substation “Convert the 115 kV yard at North Hanover Substation into an 11 breaker, breaker-and-ahalf configuration”
115 kV
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 35
Hunterstown – North Hanover 115 kV Line Customer Connection “Modify relay settings at North Hanover and Hunterstown substations”
115 kV
2026-06-16 SRRTEP Mid-Atlantic
Item 03 - MetEd Supplemental Projects p. 7
North Hanover 115 kV Breaker and a Half Substation “North Hanover Substation is in a straight bus configuration with terminals to three distribution transformers”
115 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16
Jackson – North Hanover 115 kV Line “Replace limiting conductors, line relaying, and disconnect switches at North Hanover”
115 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16
Jackson – North Hanover 115 kV Line “Replace limiting conductors, line relaying, and disconnect switches at North Hanover”
115 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 35
Hunterstown – North Hanover 115 kV Line Customer Connection “Modify relay settings at North Hanover and Hunterstown substations”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this