Substation Scout

Urban Substation

Named in 6 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
ATSIzone
138 kVkV as printed
7mentions

Also printed as: Urban

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Tusc Substation
ATSI-2023-011
Conceptual $16.72M 12/31/2027 Not printed 2025-09-19
SRRTEP Western
ATSI Transmission Zone M-3 Process Firestone – Urban 138 kV Misoperation Relays
ATSI-2023-041 · s3122.1
Not printed $2.5M 5/15/2026 Not printed 2024-10-08
TEAC
Firestone Substation
ATSI-2025-021 · s3780.1
Not printed $0.3M 2/16/2026 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FIRESTONE; PINE; SOUTH AKRON; STAR; TUSC; URBAN; WADSWORTH; WEST AKRON → TUSC 2025-09-19 2026-10-06
Substations named FIRESTONE; SOUTH AKRON; URBAN → FIRESTONE; URBAN 2025-09-19 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 16
Firestone Substation “results in a single ten-mile-long radial feed to Urban Substation.”
2026-09-23* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2026 RTEP p. 16
Firestone Substation No role wording
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 30
ATSI Transmission Zone M-3 Process Firestone – Urban 138 kV Misoperation Relays “At Urban Substation  Replace (1) 138 kV Oil Circuit Breaker.”
2025-09-19 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 7
Tusc Substation No role wording
138 kV
2025-09-19 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 9
Firestone Substation No role wording
138 kV
2025-07-18 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 4
Firestone Substation No role wording
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 30
ATSI Transmission Zone M-3 Process Firestone – Urban 138 kV Misoperation Relays “Replace (1) 138 kV Oil Circuit Breaker.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this