Urban Substation
Named in 6 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
ATSIzone
138 kVkV as printed
7mentions
Also printed as: Urban
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Tusc Substation ATSI-2023-011 |
Conceptual | $16.72M | 12/31/2027 | Not printed | 2025-09-19 SRRTEP Western |
| ATSI Transmission Zone M-3 Process
Firestone – Urban 138 kV Misoperation Relays ATSI-2023-041 · s3122.1 |
Not printed | $2.5M | 5/15/2026 | Not printed | 2024-10-08 TEAC |
| Firestone Substation ATSI-2025-021 · s3780.1 |
Not printed | $0.3M | 2/16/2026 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | FIRESTONE; PINE; SOUTH AKRON; STAR; TUSC; URBAN; WADSWORTH; WEST AKRON → TUSC | 2025-09-19 | 2026-10-06 |
| Substations named | FIRESTONE; SOUTH AKRON; URBAN → FIRESTONE; URBAN | 2025-09-19 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 16 |
Firestone Substation | “results in a single ten-mile-long radial feed to Urban Substation.” |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 16 |
Firestone Substation | No role wording |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 30 |
ATSI Transmission Zone M-3 Process Firestone – Urban 138 kV Misoperation Relays | “At Urban Substation Replace (1) 138 kV Oil Circuit Breaker.” |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 7 |
Tusc Substation | No role wording 138 kV |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 9 |
Firestone Substation | No role wording 138 kV |
| 2025-07-18 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 4 |
Firestone Substation | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 30 |
ATSI Transmission Zone M-3 Process Firestone – Urban 138 kV Misoperation Relays | “Replace (1) 138 kV Oil Circuit Breaker.” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.