Named in 9 PJM planning documents for 7 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
12mentions

Also printed as: Pickens Substation · Pickens 138 kV Substation

PJM interconnection queue

A PJM queue substation page has the same name: Pickens (WV) — 2 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Project
APS-2021-007
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Project
APS-2021-009
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Loughs Lane – Pickens 138 kV Line
APS-2023-032 · s3938.1
Not printed $182.84M 11/04/2032 Not printed 2026-10-06
TEAC
Misoperation Relay Projects
APS-2023-067, APS-2023-068 · s3357.1, s3358.1
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118
Not printed Not printed Not printed Not printed 2024-12-13
SRRTEP Western
Misoperation Relays
APS-2024-113
Conceptual $2.35 M 12/31/2028 Not printed 2026-09-18
SRRTEP Western
Loughs Lane - Pickens 138 kV Line
APS-2025-016
Conceptual $1.05M 12/31/2026 Not printed 2026-01-16
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BELMONT; FRENCH CREEK; JOHNS JCT; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER → BELMONT; FRENCH CREEK; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER 2024-10-08 Not reported
Substations named BEVERLY; BEVERLY TAP; DURBIN; DURBIN TAP; LOUGHS LANE; PICKENS → BEVERLY; DURBIN; LOUGHS LANE; PICKENS 2026-05-15 2026-10-06
Substations named BEVERLY TAP; DURBIN TAP; HARDY; JUNCTION; LOUGHS LANE; PICKENS → HARDY; JUNCTION; LOUGHS LANE; PICKENS 2024-10-08 Not reported
Substations named BEVERLY TAP; DURBIN TAP; LOUGHS LANE; PICKENS → LOUGHS LANE; PICKENS 2025-05-16 2026-01-16

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 63
Loughs Lane – Pickens 138 kV Line “At Pickens Substation: Remove wave trap, replace substation conductor, and relaying.”
138 kV
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 63
Loughs Lane – Pickens 138 kV Line “At Pickens Substation: Remove wave trap”
2026-09-18 SRRTEP Western
Item 01 - APS Supplemental Projects p. 11
Misoperation Relays “At Pickens Substation: Replace wavetrap and relays”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 79
Misoperation Relay Project “Pickens 138 kV Substation – Replace substation conductor, circuit breaker, and wave trap”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 91
Misoperation Relay Projects “At Pickens Substation, replace line trap, circuit breaker, disconnect switches and relaying”
138 kV
2026-05-15 SRRTEP Western
Item 03 - APS Supplemental Projects p. 7
Loughs Lane – Pickens 138 kV Line “At Pickens Substation: Remove wave trap, replace substation conductor, and relaying.”
138 kV
2026-01-16 SRRTEP Western
Item 03 - APS Supplemental Projects p. 8
Loughs Lane - Pickens 138 kV Line No role wording
138 kV
2025-05-16 SRRTEP Western
Item 06 - APS Supplemental Project p. 4
Loughs Lane - Pickens 138 kV Line No role wording
138 kV
2024-12-13 SRRTEP Western
Item 15 - APS Supplemental Project p. 6
Misoperation Relay Projects No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 78
Misoperation Relay Project No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 79
Misoperation Relay Project “Pickens 138 kV Substation – Replace substation conductor, circuit breaker, and wave trap”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 91
Misoperation Relay Projects “At Pickens Substation, replace line trap, circuit breaker, disconnect switches and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this