Chickahominy
Named in 14 PJM planning documents for 11 projects, from December 3, 2024 to October 6, 2026.
Also printed as: Chickahominy substation
PJM interconnection queue
A PJM queue substation page has the same name: Chickahominy (VA) — 11 queue requests filed, 1 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer b3213 |
Not printed | $34.03M | 6/1/2023 | Not printed | 2026-04-07 TEAC |
| Dominion Transmission Zone: Baseline
500kV Line #557 Elmont-Chickahominy b3692 |
Not printed | $185.16 M | 6/30/2028 | Not printed | 2025-05-06 TEAC |
| Regional Solution: 2025-W1-275 Portfolio b4053.1 |
Not printed | $4832.45 | 6/1/2032 | Not printed | 2026-01-06 TEAC |
| Customer Load Request DOM-2019-0021, DOM-2024-0022, DOM-2024-0023, DOM-2024-0024 - DNH |
Conceptual | 101.7M | Q4 2030 | Not printed | 2026-07-07 TEAC |
| Dominion Transmission Zone: Supplemental
Do No Harm Analysis DOM-2024-0018 · s3673 |
Engineering | $20M Substation, $5M Transmission Line | Q4 2027 | 255.0 MW | 2025-10-08 TEAC |
| Gray Bark 230kV Delivery - DEV DOM-2024-0019 · s3676 |
Engineering | $20M Substation, $20M Transmission Lines | Q3 2027 | 300.0 MW | 2025-10-08 TEAC |
| Stockholm 230kV Delivery - DEV DOM-2024-0049 · s3995 |
Conceptual | $ 26M | Q4 2028 | 300 MW | 2026-10-06 TEAC |
| Dominion Transmission Zone: Supplemental
Operational Flexibility and Efficiency DOM-2024-0051 · s3999 |
Engineering | $185M | 12/31/2030 | Not printed | 2026-10-06 TEAC |
| Dominion Transmission Zone: Supplemental
Equipment Material Condition, Performance and Risk DOM-2025-0026 · s3915 |
Engineering | $160M | 12/31/2028 | Not printed | 2026-10-06 TEAC |
| Equipment Material Condition, Performance and Risk DOM-2025-0026 Update |
Engineering | $160M | 12/31/2028 | Not printed | 2025-09-09 TEAC |
| Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio 2025-W1-275 |
Not printed | Not printed | 6/1/2032 | Not printed | 2025-12-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate prior value printed on the same page |
$31.05M → $34.03M | 2026-04-07 | 2026-04-07 |
| Cost estimate prior value printed on the same page |
$58.155 M → $185.16 M | 2025-05-06 | 2025-05-06 |
| Cost estimate | $101.7M → $15.0 M | 2026-10-06 | Not reported |
| Cost estimate | $15.0 M → $92.7M | 2024-10-08 | 2024-12-03 |
| Cost estimate prior value printed on the same page |
$92.7M → $95.1M | 2026-01-06 | 2026-01-06 |
| Cost estimate | $92.7M → $95.1M | 2025-10-08 | 2026-01-06 |
| Cost estimate prior value printed on the same page |
$95.1M → 101.7M | 2026-07-07 | 2026-07-07 |
| Cost estimate | $95.1M → 101.7M | 2026-01-06 | 2026-07-07 |
| Cost estimate prior value printed on the same page |
$92.7M → $101.7M | 2026-10-06 | 2026-10-06 |
| In-service date | Q4 2030 → Q4 2026 | 2026-10-06 | Not reported |
| In-service date | Q4 2026 → Q4 2028 | 2024-10-08 | 2024-12-03 |
| In-service date | Q4 2028 → Q4 2030 | 2026-01-06 | 2026-07-07 |
| Status | conceptual (Conceptual) → engineering (Engineering) | 2026-10-06 | Not reported |
| Status | engineering (Engineering) → conceptual (Conceptual) | 2026-01-06 | 2026-07-07 |
| Substations named | ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS → ALLIED; BERMUDA HUNDRED; ICI | 2026-10-06 | Not reported |
| Substations named | ALLIED; BERMUDA HUNDRED; ICI → BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SYCAMORE SPRINGS | 2024-10-08 | 2024-12-03 |
| Substations named | BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SYCAMORE SPRINGS → ENON; MEADOWVILLE; SYCAMORE SPRINGS | 2024-12-03 | 2025-10-08 |
| Substations named | ENON; MEADOWVILLE; SYCAMORE SPRINGS → BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS | 2025-10-08 | 2026-01-06 |
| Substations named | BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS → BERMUDA HUNDRED; CHICKAHOMINY; ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS | 2026-01-06 | 2026-07-07 |
| Substations named | BERMUDA HUNDRED; CHICKAHOMINY; ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS → ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS | 2026-07-07 | 2026-10-06 |
| In-service date | Q4 2027 → 12/01/2030 | 2025-01-07 | 2025-05-06 |
| In-service date | 12/01/2030 → Q4 2027 | 2025-05-06 | 2025-10-08 |
| Status | engineering (Engineering) → conceptual (Conceptual) | 2025-01-07 | 2025-05-06 |
| Status | conceptual (Conceptual) → engineering (Engineering) | 2025-05-06 | 2025-10-08 |
| Substations named | CHICKAHOMINY; ELMONT; THICKET; WHITE OAK → BERMUDA HUNDRED; CHICKAHOMINY; DARBYTOWN; ELKO; ELMONT; TECHPARK PLACE; THICKET; WHITE OAK | 2025-01-07 | 2025-05-06 |
| Substations named | STOCKHOLM; THICKET → CHICKAHOMINY; ELMONT; STOCKHOLM; THICKET; WHITE OAK | 2026-05-08 | 2026-10-06 |
| Cost estimate prior value printed on the same page |
$108M → $165M | 2026-06-02 | 2026-06-02 |
| Cost estimate | Transmission: $108M; Substation: $15M → $165M | 2025-06-05 | 2026-06-02 |
| Cost estimate | $165M → $185M | 2026-06-02 | 2026-10-06 |
| Status | conceptual (Conceptual) → engineering (Engineering) | 2025-06-05 | 2026-06-02 |
| Cost estimate | $54M → $160M | 2025-07-08 | 2026-10-06 |
| Substations named | CHESTERFIELD; CHICKAHOMINY; LADYSMITH; LANEXA; POSSUM POINT; PROVIDENCE FORGE; TURNER → CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER | 2025-06-05 | 2025-07-08 |
| Substations named | CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER → CHESTERFIELD; CHICKAHOMINY; LANEXA; PROVIDENCE FORGE; TURNER | 2025-07-08 | 2026-10-06 |
| Cost estimate prior value printed on the same page |
$54M → $160M | 2025-09-09 | 2025-09-09 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 60 |
Stockholm 230kV Delivery - DEV | No role wording |
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 69 |
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency | “Terminate one 230kV conductor rated at 1573 MVA at Thornburg and Chickahominy.” |
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 94 |
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk | No role wording |
| 2026-07-07 | TEAC Item 14 - DOM Supplemental Projects p. 16 |
Customer Load Request | “existing Chickahominy substation” |
| 2026-06-02 | TEAC Item 11 - DOM Supplemental Projects p. 12 |
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency | No role wording |
| 2026-04-07 | TEAC Item 11 - Reliability Analysis Update p. 18 |
Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer | “Reconfigure 500kV portion of substation into a ring bus” 500/230 kV |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 23 |
Customer Load Request | “existing Chickahominy substation” |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 31 |
Regional Solution: 2025-W1-275 Portfolio | “Uprate Line 567 associated terminal equipment at Chickahominy to 5000A standards.” 500 kV |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 77 |
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio | “Uprate Line 567 associated terminal equipment at Chickahominy to 5000A standards.” |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 25 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis | “back to Chickahominy substation” |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 31 |
Gray Bark 230kV Delivery - DEV | No role wording |
| 2025-09-09 | TEAC Item 14 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk | No role wording |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 10 |
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency | No role wording |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk | No role wording |
| 2025-05-06 | TEAC Item 09 - DOM Supplemental Projects p. 8 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis | “back to Chickahominy substation” |
| 2025-05-06 | TEAC Item 10 - Reliability Analysis Update p. 8 |
Dominion Transmission Zone: Baseline 500kV Line #557 Elmont-Chickahominy | No role wording |
| 2025-01-07 | TEAC Item 10 - Dominion Supplemental Projects p. 10 |
Gray Bark 230kV Delivery - DEV | No role wording 230kV |
| 2025-01-07 | TEAC Item 10 - Dominion Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis | No role wording 230kV |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 19 |
Customer Load Request | “existing Chickahominy substation” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.