Named in 1 PJM planning document for 1 project, on October 8, 2025.

Existingdescribed as
COMEDzone
138 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Elk Grove
ComEd-2024-003 · s3584.1, s3584.2
Conceptual $289.4M 12/31/2027 (s3584.1), 12/31/2028 (s3584.2) 250 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $319.4M → $289.4M 2025-09-19 2025-10-08
Status engineering (Engineering) → conceptual (Conceptual) 2025-09-19 2025-10-08
Substations named COMED DIERKING; COMED ELK GROVE EAST; COMED ITASCA; COMED PINE → DIERKING; ELK GROVE EAST; ITASCA; PINE 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 16
Customer in Elk Grove “Install 2 new 138kV CBs to the double ring bus configuration at ComEd Dierking substation”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.