Substation Scout

Rolling Meadows

Named in 1 PJM planning document for 1 project, on October 8, 2025.

Not stateddescribed as
COMEDzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Elk Grove
ComEd-2023-008 · s3582.1, s3582.2
Engineering $158M 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) 378 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DES PLAINES; ELK GROVE; LOMBARD; ROLLING MEADOWS; SCHAUMBURG → DES PLAINES; ELK GROVE; LOMBARD; SCHAUMBURG 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 11
Customer in Elk Grove No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this