Named in 8 PJM planning documents for 7 projects, from June 5, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
230kV, 500kVkV as printed
8mentions

PJM interconnection queue

A PJM queue substation page has the same name: Possum Point (VA) — 18 queue requests filed, 8 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Thornburg 500/230kV Substation (Line #568 Ladysmith – Possum Point Cut-In)
b4000.351 & b4000.352
Not printed $7.2M 9/16/2030 Not printed 2026-10-06
TEAC
Regional Solution: 2025-W1-275 Portfolio
b4053.1
Not printed $4832.45 6/1/2032 Not printed 2026-01-06
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2023-0016 · s3731
Engineering $27 M 05/31/2025 248.0 MW 2026-10-06
TEAC
Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines
DOM-2024-0035 · s3701
Conceptual $180.0M 06/01/2029 Not printed 2025-10-08
TEAC
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk
DOM-2025-0026
Not printed Not printed Not printed Not printed 2025-06-05
TEAC
Equipment Material Condition, Performance and Risk
DOM-2025-0026 Update
Engineering $160M 12/31/2028 Not printed 2025-09-09
TEAC
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio
2025-W1-275
Not printed Not printed 6/1/2032 Not printed 2025-12-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $27.0 M → $450.0M 2025-04-01 2026-06-02
Cost estimate $450.0M → $27 M 2026-06-02 2026-10-06
In-service date 05/31/2025 → 07/01/2029 2025-04-01 2026-06-02
In-service date 07/01/2029 → 05/31/2025 2026-06-02 2026-10-06
Substations named ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; RUTHER GLEN; ST JOHNS → ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2025-04-01 2026-06-02
Substations named ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG → ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2026-06-02 2026-10-06
Cost estimate $54M → $160M 2025-07-08 2026-10-06
Substations named CHESTERFIELD; CHICKAHOMINY; LADYSMITH; LANEXA; POSSUM POINT; PROVIDENCE FORGE; TURNER → CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER 2025-06-05 2025-07-08
Substations named CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER → CHESTERFIELD; CHICKAHOMINY; LANEXA; PROVIDENCE FORGE; TURNER 2025-07-08 2026-10-06
Cost estimate
prior value printed on the same page
$54M → $160M 2025-09-09 2025-09-09

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 50
Dominion Transmission Zone: Supplemental Do No Harm Analysis “existing Fredericksburg, Ladysmith, and Possum Point substations”
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 8
Thornburg 500/230kV Substation (Line #568 Ladysmith – Possum Point Cut-In) No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental Do No Harm Analysis “split bus configuration at Possum Point”
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 39
Regional Solution: 2025-W1-275 Portfolio “Uprate Line 560 terminal equipment at Possum Point substation so as not to limit the conductor rating.”
500kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 85
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio “Uprate Line 560 terminal equipment at Possum Point substation so as not to limit the conductor rating.”
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 8
Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines “Reconfigure the 230kV terminals at Possum Point”
230kV
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk No role wording
2025-06-05 TEAC
Item 08 - DOM Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this