Named in 4 PJM planning documents for 5 projects, from November 6, 2024 to November 14, 2025.
Existingdescribed as
AEPzone
138kV, 345 kV, 345kVkV as printed
5mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| East Lima - Haviland 138kV Sag Study b3972.1 |
Not printed | $6.80M | 04/15/2030 | Not printed | 2025-11-14 SRRTEP Western |
| East Lima - Haviland 138kV Sag Study | Not printed | 6.80M | 04/15/2030 | Not printed | 2025-10-17 SRRTEP Western |
| Fort Wayne, IN AEP-2024-IM014 |
Not printed | Not printed | Not printed | Not printed | 2024-11-06 TEAC |
| Maddox Creek, OH/E. Lima, OH AEP-2025-OH016 |
Not printed | Not printed | 12/31/2028 | 900MW | 2025-08-05 TEAC |
| E. Lima, OH/Fostoria Ctl, OH AEP-2025-OH018 |
Not printed | Not printed | 9/30/2028 | 300 MW | 2025-08-05 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 62 |
East Lima - Haviland 138kV Sag Study | No role wording 138kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 57 |
East Lima - Haviland 138kV Sag Study | No role wording 138kV |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 5 |
Maddox Creek, OH/E. Lima, OH | “existing East Lima station” |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 6 |
E. Lima, OH/Fostoria Ctl, OH | No role wording 345 kV |
| 2024-11-06 | TEAC Item 07 - AEP Supplemental Projects p. 3 |
Fort Wayne, IN | No role wording 345kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.