Falcon
Named in 3 PJM planning documents for 3 projects, from October 17, 2025 to May 15, 2026.
Existingdescribed as
AEPzone
69 kVkV as printed
3mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Falcon 69 kV Capacitor Bank Installation b3951.1 |
Not printed | $3.35 M | 04/15/2030 | Not printed | 2025-11-14 SRRTEP Western |
| Falcon 69 kV Capacitor Bank Installation | Not printed | $3.35 M | 04/15/2030 | Not printed | 2025-10-17 SRRTEP Western |
| Falcon, KY AEP-2026-AP002 |
Not printed | Not printed | Not printed | Not printed | 2026-05-15 SRRTEP Western |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-05-15 | SRRTEP Western Item 01 - AEP Supplemental Projects p. 6 |
Falcon, KY | “Falcon Station is in Salyersville, KY. Falcon station is constructed with deteriorated wood tie foundations” |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 38 |
Falcon 69 kV Capacitor Bank Installation | “Falcon station will
need to be expanded to fit the capacitor bank. (b3951.1)” 69 kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 33 |
Falcon 69 kV Capacitor Bank Installation | “Falcon station will need to be expanded” 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.