Cranes Corner
Named in 1 PJM planning document for 2 projects, on October 8, 2025.
Existingdescribed as
DOMzone
—kV as printed
2mentions
Also printed as: Cranes Corner Sub
PJM interconnection queue
A PJM queue substation page has the same name: Cranes Corner (VA) — 3 queue requests filed, 1 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Centreport 230kV Delivery - DEV DOM-2024-0005 · s3695.1 |
Conceptual | $30.0 M | 07/01/2027 | 136 MW | 2025-10-08 TEAC |
| Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines DOM-2024-0035 · s3701 |
Conceptual | $180.0M | 06/01/2029 | Not printed | 2025-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 5 |
Centreport 230kV Delivery - DEV | No role wording |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 8 |
Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines | “Expand Cranes Corner Sub” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.