Centreport
Named in 2 PJM planning documents for 3 projects, from October 8, 2025 to October 6, 2026.
Newdescribed as
DOMzone
230 kVkV as printed
3mentions
Described as new: “Construct Centreport 230 kV switching station” — source, page 5
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Alto 230kV Delivery - DEV DOM-2023-0056 · s3813 |
Engineering | $16.5M | 07/02/2027 | 213.7 MW | 2026-10-06 TEAC |
| Centreport 230kV Delivery - DEV DOM-2024-0005 · s3695.1 |
Conceptual | $30.0 M | 07/01/2027 | 136 MW | 2025-10-08 TEAC |
| Baritone 230kV Delivery - DEV DOM-2024-0008 · s3810 |
Engineering | $15.5M | 12/30/2029 | 32 MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ALTO → ALLMAN; ALTO; AQUIA HARBOR; CENTREPORT; SPARTAN | 2025-10-08 | 2026-10-06 |
| Substations named | ALTO; BARITONE → ALLMAN; ALTO; BARITONE; CENTREPORT | 2025-10-08 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 3 |
Alto 230kV Delivery - DEV | No role wording |
| 2026-10-06 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 5 |
Baritone 230kV Delivery - DEV | No role wording |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 5 |
Centreport 230kV Delivery - DEV | “Construct Centreport 230 kV switching station” 230 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.