Long Creek

Named in 2 PJM planning documents for 1 project, from October 16, 2025 to November 13, 2025.

Existingdescribed as
DOMzone
115kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Equipment Material Condition, Performance and Risk
DOM-2025-0058
Engineering $64M 12/31/2027 Not printed 2025-11-13
SRRTEP Southern

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/31/2027 → 04/01/2027 2025-11-13 2026-10-06
Status engineering (Engineering) → under-construction (Construction) 2025-11-13 2026-10-06
Substations named BAINS STORE; BAYSIDE; BURTON; LONG CREEK; VA BEACH → BURTON; VA BEACH 2025-11-13 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-11-13 SRRTEP Southern
Item 07 - DOM Supplemental Projects p. 7
Equipment Material Condition, Performance and Risk “Rebuild approximately 12.7 miles of Line #27 between Burton <> Bayside <> Long Creek <> Bains Store <> VA Beach”
115kV
2025-10-16 SRRTEP Southern
Item 08 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk No role wording