Substation Scout

VA Beach

Named in 3 PJM planning documents for 1 project, from October 16, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
115kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
115kV Line 27 – EOL Rebuild
DOM-2025-0058 · s3815
Under construction $64M 04/01/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/31/2027 → 04/01/2027 2025-11-13 2026-10-06
Status engineering (Engineering) → under-construction (Construction) 2025-11-13 2026-10-06
Substations named BAINS STORE; BAYSIDE; BURTON; LONG CREEK; VA BEACH → BURTON; VA BEACH 2025-11-13 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 10
115kV Line 27 – EOL Rebuild No role wording
2025-11-13 SRRTEP Southern
Item 07 - DOM Supplemental Projects p. 7
115kV Line 27 – EOL Rebuild “Rebuild approximately 12.7 miles of Line #27 between Burton <> Bayside <> Long Creek <> Bains Store <> VA Beach”
115kV
2025-10-16 SRRTEP Southern
Item 08 - DOM Supplemental Projects p. 3
115kV Line 27 – EOL Rebuild No role wording
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this