Enon substation

Named in 7 PJM planning documents for 2 projects, from December 3, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
230kVkV as printed
8mentions

Also printed as: Enon

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer Load Request
DOM-2019-0021, DOM-2024-0022, DOM-2024-0023, DOM-2024-0024 – DNH · s3672
Conceptual $101.7M Q4 2030 Not printed 2026-10-06
TEAC
Dominion Transmission Zone: Supplemental Customer Load Request
DOM-2025-0010 · s3688
Engineering $1.6M 3/1/2028 88.9 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $101.7M → $15.0 M 2026-10-06 Not reported
Cost estimate $15.0 M → $92.7M 2024-10-08 2024-12-03
Cost estimate
prior value printed on the same page
$92.7M → $95.1M 2026-01-06 2026-01-06
Cost estimate $92.7M → $95.1M 2025-10-08 2026-01-06
Cost estimate
prior value printed on the same page
$95.1M → 101.7M 2026-07-07 2026-07-07
Cost estimate $95.1M → 101.7M 2026-01-06 2026-07-07
Cost estimate
prior value printed on the same page
$92.7M → $101.7M 2026-10-06 2026-10-06
In-service date Q4 2030 → Q4 2026 2026-10-06 Not reported
In-service date Q4 2026 → Q4 2028 2024-10-08 2024-12-03
In-service date Q4 2028 → Q4 2030 2026-01-06 2026-07-07
Status conceptual (Conceptual) → engineering (Engineering) 2026-10-06 Not reported
Status engineering (Engineering) → conceptual (Conceptual) 2026-01-06 2026-07-07
Substations named ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS → ALLIED; BERMUDA HUNDRED; ICI 2026-10-06 Not reported
Substations named ALLIED; BERMUDA HUNDRED; ICI → BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SYCAMORE SPRINGS 2024-10-08 2024-12-03
Substations named BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SYCAMORE SPRINGS → ENON; MEADOWVILLE; SYCAMORE SPRINGS 2024-12-03 2025-10-08
Substations named ENON; MEADOWVILLE; SYCAMORE SPRINGS → BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS 2025-10-08 2026-01-06
Substations named BERMUDA HUNDRED; CHICKAHOMINY; ENON; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS → BERMUDA HUNDRED; CHICKAHOMINY; ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS 2026-01-06 2026-07-07
Substations named BERMUDA HUNDRED; CHICKAHOMINY; ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS → ENON; HOPEWELL; MEADOWVILLE; SHAND CREEK; SYCAMORE SPRINGS 2026-07-07 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 49
Customer Load Request “existing Enon substation”
230kV
2026-07-07 TEAC
Item 14 - DOM Supplemental Projects p. 16
Customer Load Request “Enon substation was not able to be expanded”
2026-01-06 TEAC
Item 07 - DOM Supplemental Projects p. 23
Customer Load Request “Enon substation was not able to be expanded”
230kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 21
Customer Load Request “Enon substation will need to be expanded”
230kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 54
Dominion Transmission Zone: Supplemental Customer Load Request “add TX3 at existing Enon substation”
230kV
2025-04-01 TEAC
Item 11 - DOM Supplemental Projects p. 5
Dominion Transmission Zone: Supplemental Customer Load Request “add TX3 at existing Enon substation”
230kV
2025-03-04 TEAC
Item 12 - Dominion Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Customer Load Request “existing Enon substation”
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 19
Customer Load Request “existing Enon substation by constructing approximately two miles of double circuit 230kV lines. • Enon substation will need to be expanded”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.